Seung-Hyun Lee
- 건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발 (Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 5 (octobre 2014). (2014):
- 교육시설물 공사비 관리 효율화를 위한 BIM 적용방안에 관한 연구 (Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 6 (décembre 2010). (2010):
- 설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발 (Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone Information). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 8, n. 2 (avril 2008). (2008):
- Evaluation of seal coating treatments to manage temporary pavement paint markings during highway construction. Dans: KSCE Journal of Civil Engineering, v. 14, n. 4 (juin 2010). (2010):
- Development of scheduling model for earth work using genetic algorithm. Dans: KSCE Journal of Civil Engineering, v. 18, n. 6 (août 2014). (2014):
- Comparison of bearing capacity characteristics of sand and gravel compaction pile treated ground. Dans: KSCE Journal of Civil Engineering, v. 9, n. 3 (mai 2005). (2005):
- Measuring Project Level Productivity on Transportation Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 3 (mars 2006). (2006):