건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발 (Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field)
Author(s): |
Seung-Hak Lee
Jea-Ho Son Seung-Hyun Lee |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), October 2014, n. 5, v. 14 |
Page(s): | 467-476 |
DOI: | 10.5345/jkibc.2014.14.5.467 |
- About this
data sheet - Reference-ID
10761653 - Published on:
15/03/2024 - Last updated on:
15/03/2024