0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Karim, Asim / Adeli, Hojjat (2002): Comparison of Fuzzy-Wavelet Radial Basis Function Neural Network Freeway Incident Detection Model with California Algorithm. In: Journal of Transportation Engineering, v. 128, n. 1 (January 2002).

    https://doi.org/10.1061/(asce)0733-947x(2002)128:1(21)

  2. Karim, Asim / Adeli, Hojjat (2003): CBR Model for Freeway Work Zone Traffic Management. In: Journal of Transportation Engineering, v. 129, n. 2 (March 2003).

    https://doi.org/10.1061/(asce)0733-947x(2003)129:2(134)

  3. Karim, Asim / Adeli, Hojjat (2003): Radial Basis Function Neural Network for Work Zone Capacity and Queue Estimation. In: Journal of Transportation Engineering, v. 129, n. 5 (September 2003).

    https://doi.org/10.1061/(asce)0733-947x(2003)129:5(494)

  4. Karim, Asim / Adeli, Hojjat (2003): Fast Automatic Incident Detection on Urban and Rural Freeways Using Wavelet Energy Algorithm. In: Journal of Transportation Engineering, v. 129, n. 1 (January 2003).

    https://doi.org/10.1061/(asce)0733-947x(2003)129:1(57)

  5. Karim, Asim / Adeli, Hojjat (2002): Incident Detection Algorithm using Wavelet Energy Representation of Traffic Patterns. In: Journal of Transportation Engineering, v. 128, n. 3 (May 2002).

    https://doi.org/10.1061/(asce)0733-947x(2002)128:3(232)

  6. Adeli, Hojjat / Karim, Asim (2000): Fuzzy-Wavelet RBFNN Model for Freeway Incident Detection. In: Journal of Transportation Engineering, v. 126, n. 6 (December 2000).

    https://doi.org/10.1061/(asce)0733-947x(2000)126:6(464)

  7. Karim, Asim / Adeli, Hojjat (1999): A new generation software for construction scheduling and management. In: Engineering, Construction and Architectural Management, v. 6, n. 4 (April 1999).

    https://doi.org/10.1108/eb021126

  8. Karim, Asim / Adeli, Hojjat (1999): CONSCOM: An OO Construction Scheduling and Change Management System. In: Journal of Construction Engineering and Management, v. 125, n. 5 (September 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:5(368)

  9. Karim, Asim / Adeli, Hojjat (1999): OO Information Model for Construction Project Management. In: Journal of Construction Engineering and Management, v. 125, n. 5 (September 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:5(361)

  10. Adeli, Hojjat / Karim, Asim (1997): Scheduling/Cost Optimization and Neural Dynamics Model for Construction. In: Journal of Construction Engineering and Management, v. 123, n. 4 (December 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:4(450)

  11. Karim, Asim / Adeli, Hojjat (2000): Global Optimum Design of Cold-Formed Steel I-Shape Beams. In: Practice Periodical on Structural Design and Construction, v. 5, n. 2 (May 2000).

    https://doi.org/10.1061/(asce)1084-0680(2000)5:2(78)

  12. Karim, Asim / Adeli, Hojjat (1999): Global Optimum Design of Cold-Formed Steel Z-Shape Beams. In: Practice Periodical on Structural Design and Construction, v. 4, n. 1 (February 1999).

    https://doi.org/10.1061/(asce)1084-0680(1999)4:1(17)

  13. Adeli, Hojjat / Karim, Asim (1997): Neural Network Model for Optimization of Cold-Formed Steel Beams. In: Journal of Structural Engineering (ASCE), v. 123, n. 11 (November 1997).

    https://doi.org/10.1061/(asce)0733-9445(1997)123:11(1535)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine