CONSCOM: An OO Construction Scheduling and Change Management System
Author(s): |
Asim Karim
Hojjat Adeli |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 1999, n. 5, v. 125 |
Page(s): | 368-376 |
DOI: | 10.1061/(asce)0733-9364(1999)125:5(368) |
- About this
data sheet - Reference-ID
10158026 - Published on:
11/12/2018 - Last updated on:
11/12/2018