0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Karim, Asim / Adeli, Hojjat (2002): Comparison of Fuzzy-Wavelet Radial Basis Function Neural Network Freeway Incident Detection Model with California Algorithm. Dans: Journal of Transportation Engineering, v. 128, n. 1 (janvier 2002).

    https://doi.org/10.1061/(asce)0733-947x(2002)128:1(21)

  2. Karim, Asim / Adeli, Hojjat (2003): CBR Model for Freeway Work Zone Traffic Management. Dans: Journal of Transportation Engineering, v. 129, n. 2 (mars 2003).

    https://doi.org/10.1061/(asce)0733-947x(2003)129:2(134)

  3. Karim, Asim / Adeli, Hojjat (2003): Radial Basis Function Neural Network for Work Zone Capacity and Queue Estimation. Dans: Journal of Transportation Engineering, v. 129, n. 5 (septembre 2003).

    https://doi.org/10.1061/(asce)0733-947x(2003)129:5(494)

  4. Karim, Asim / Adeli, Hojjat (2003): Fast Automatic Incident Detection on Urban and Rural Freeways Using Wavelet Energy Algorithm. Dans: Journal of Transportation Engineering, v. 129, n. 1 (janvier 2003).

    https://doi.org/10.1061/(asce)0733-947x(2003)129:1(57)

  5. Karim, Asim / Adeli, Hojjat (2002): Incident Detection Algorithm using Wavelet Energy Representation of Traffic Patterns. Dans: Journal of Transportation Engineering, v. 128, n. 3 (mai 2002).

    https://doi.org/10.1061/(asce)0733-947x(2002)128:3(232)

  6. Adeli, Hojjat / Karim, Asim (2000): Fuzzy-Wavelet RBFNN Model for Freeway Incident Detection. Dans: Journal of Transportation Engineering, v. 126, n. 6 (décembre 2000).

    https://doi.org/10.1061/(asce)0733-947x(2000)126:6(464)

  7. Karim, Asim / Adeli, Hojjat (1999): A new generation software for construction scheduling and management. Dans: Engineering, Construction and Architectural Management, v. 6, n. 4 (avril 1999).

    https://doi.org/10.1108/eb021126

  8. Karim, Asim / Adeli, Hojjat (1999): CONSCOM: An OO Construction Scheduling and Change Management System. Dans: Journal of Construction Engineering and Management, v. 125, n. 5 (septembre 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:5(368)

  9. Karim, Asim / Adeli, Hojjat (1999): OO Information Model for Construction Project Management. Dans: Journal of Construction Engineering and Management, v. 125, n. 5 (septembre 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:5(361)

  10. Adeli, Hojjat / Karim, Asim (1997): Scheduling/Cost Optimization and Neural Dynamics Model for Construction. Dans: Journal of Construction Engineering and Management, v. 123, n. 4 (décembre 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:4(450)

  11. Karim, Asim / Adeli, Hojjat (2000): Global Optimum Design of Cold-Formed Steel I-Shape Beams. Dans: Practice Periodical on Structural Design and Construction, v. 5, n. 2 (mai 2000).

    https://doi.org/10.1061/(asce)1084-0680(2000)5:2(78)

  12. Karim, Asim / Adeli, Hojjat (1999): Global Optimum Design of Cold-Formed Steel Z-Shape Beams. Dans: Practice Periodical on Structural Design and Construction, v. 4, n. 1 (février 1999).

    https://doi.org/10.1061/(asce)1084-0680(1999)4:1(17)

  13. Adeli, Hojjat / Karim, Asim (1997): Neural Network Model for Optimization of Cold-Formed Steel Beams. Dans: Journal of Structural Engineering (ASCE), v. 123, n. 11 (novembre 1997).

    https://doi.org/10.1061/(asce)0733-9445(1997)123:11(1535)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine