M. Juszczyk
- Estimation Of Task Completion Times With The Use Of The PERT Method On The Example Of A Real Construction Project. In: Archives of Civil Engineering, v. 61, n. 3 (September 2015). (2015):
- Modelling Delays in Bridge Construction Projects Based on the Logit and Probit Regression. In: Archives of Civil Engineering, v. 65, n. 2 (June 2019). (2019):