M. Juszczyk
- Estimation Of Task Completion Times With The Use Of The PERT Method On The Example Of A Real Construction Project. Dans: Archives of Civil Engineering, v. 61, n. 3 (septembre 2015). (2015):
- Modelling Delays in Bridge Construction Projects Based on the Logit and Probit Regression. Dans: Archives of Civil Engineering, v. 65, n. 2 (juin 2019). (2019):