0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Piotr Jaśkowski ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Tomczak, Michał / Jaśkowski, Piotr (2024): Customized particle swarm optimization for harmonizing multi-section construction projects. In: Automation in Construction, v. 162 (June 2024).

    https://doi.org/10.1016/j.autcon.2024.105359

  2. Tomczak, Michał / Jaśkowski, Piotr (2022): Scheduling Repetitive Construction Projects: Structured Literature Review. In: Journal of Civil Engineering and Management, v. 28, n. 6 (27 May 2022).

    https://doi.org/10.3846/jcem.2022.16943

  3. Tomczak, Michał / Jaśkowski, Piotr (2022): Harmonizing construction processes in repetitive construction projects with multiple buildings. In: Automation in Construction, v. 139 (July 2022).

    https://doi.org/10.1016/j.autcon.2022.104266

  4. Biruk, Sławomir / Jaśkowski, Piotr (2016): Selection of subcontractors using ordinal ranking methods based on Condorcet approach. In: Budownictwo i Architektura, v. 15, n. 4 (December 2016).

    https://doi.org/10.24358/bud-arch_16_154_04

  5. Jaśkowski, Piotr (2015): Repetitive construction processes scheduling using mixed-integer linear programming. In: Budownictwo i Architektura, v. 14, n. 2 (June 2015).

    https://doi.org/10.35784/bud-arch.1649

  6. Biruk, Sławomir / Jaśkowski, Piotr (2013): Dobór elementów deskowania ścian z uwzględnieniem kryteriów ekonomicznych. Economic criteria for the selection of wall formwork. In: Budownictwo i Architektura, v. 12, n. 1 (March 2013).

    https://doi.org/10.35784/bud-arch.2157

  7. Jaśkowski, Piotr (2008): Metoda projektowania struktury systemu wykonawczego przedsięwzięcia budowlanego z zastosowaniem algorytmu ewolucyjnego. Designing the structure of a construction project operating system using evolutionary algorithm. In: Budownictwo i Architektura, v. 2, n. 1 (June 2008).

    https://doi.org/10.35784/bud-arch.2310

  8. Jaśkowski, Piotr / Biruk, Slawomir (2020): Scheduling of Repetitive Construction Processes with Concurrent Work of Similarly Specialized Crews. In: Journal of Civil Engineering and Management, v. 26, n. 6 (8 June 2020).

    https://doi.org/10.3846/jcem.2020.12914

  9. Tomczak, Michał / Jaśkowski, Piotr (2020): New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects. In: Journal of Construction Engineering and Management, v. 146, n. 5 (May 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001824

  10. Jaśkowski, Piotr / Biruk, Slawomir (2018): Reducing Renewable Resource Demand Fluctuation Using Soft Precedence Relations in Project Scheduling. In: Journal of Civil Engineering and Management, v. 24, n. 4 (July 2018).

    https://doi.org/10.3846/jcem.2018.3043

  11. Jaśkowski, Piotr / Sobotka, Anna (2004): Scheduling Construction Projects With Resources Accessibility Limited and Changeable in Time. In: Journal of Civil Engineering and Management, v. 10, n. 4 (December 2004).

    https://doi.org/10.3846/13923730.2004.9636319

  12. Biruk, Slawomir / Jaśkowski, Piotr (2017): Optimization of Vertical Formwork Layout Plans Using Mixed Integer Linear Programming. In: International Journal of Civil Engineering, v. 15, n. 2 (January 2017).

    https://doi.org/10.1007/s40999-016-0090-6

  13. Tomczak, Michał / Jaśkowski, Piotr (2017): Application of Type-2 Interval Fuzzy Sets to Contractor Qualification Process. In: KSCE Journal of Civil Engineering, v. 22, n. 8 (November 2017).

    https://doi.org/10.1007/s12205-017-0431-2

  14. Jaśkowski, Piotr / Biruk, Slawomir / Bucon, Robert (2010): Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment. In: Automation in Construction, v. 19, n. 2 (March 2010).

    https://doi.org/10.1016/j.autcon.2009.12.014

  15. Jaśkowski, Piotr / Sobotka, Anna (2006): Scheduling Construction Projects Using Evolutionary Algorithm. In: Journal of Construction Engineering and Management, v. 132, n. 8 (August 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:8(861)

  16. Jaśkowski, Piotr / Sobotka, Anna / Czarnigowska, Agata (2018): Decision model for planning material supply channels in construction. In: Automation in Construction, v. 90 (June 2018).

    https://doi.org/10.1016/j.autcon.2018.02.026

  17. Jaśkowski, Piotr / Czarnigowska, Agata / Tokarski, Zbigniew / Sobotka, Anna (2015): The Simulation for selecting road works equipment. In: The Baltic Journal of Road and Bridge Engineering, v. 10, n. 3 (September 2015).

    https://doi.org/10.3846/bjrbe.2015.27

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine