  1. Tomczak, Michał / Jaśkowski, Piotr (2024): Customized particle swarm optimization for harmonizing multi-section construction projects. Dans: Automation in Construction, v. 162 (juin 2024).

    https://doi.org/10.1016/j.autcon.2024.105359

  2. Tomczak, Michał / Jaśkowski, Piotr (2022): Scheduling Repetitive Construction Projects: Structured Literature Review. Dans: Journal of Civil Engineering and Management, v. 28, n. 6 (27 mai 2022).

    https://doi.org/10.3846/jcem.2022.16943

  3. Tomczak, Michał / Jaśkowski, Piotr (2022): Harmonizing construction processes in repetitive construction projects with multiple buildings. Dans: Automation in Construction, v. 139 (juillet 2022).

    https://doi.org/10.1016/j.autcon.2022.104266

  4. Biruk, Sławomir / Jaśkowski, Piotr (2016): Selection of subcontractors using ordinal ranking methods based on Condorcet approach. Dans: Budownictwo i Architektura, v. 15, n. 4 (décembre 2016).

    https://doi.org/10.24358/bud-arch_16_154_04

  5. Jaśkowski, Piotr (2015): Repetitive construction processes scheduling using mixed-integer linear programming. Dans: Budownictwo i Architektura, v. 14, n. 2 (juin 2015).

    https://doi.org/10.35784/bud-arch.1649

  6. Biruk, Sławomir / Jaśkowski, Piotr (2013): Dobór elementów deskowania ścian z uwzględnieniem kryteriów ekonomicznych. Economic criteria for the selection of wall formwork. Dans: Budownictwo i Architektura, v. 12, n. 1 (mars 2013).

    https://doi.org/10.35784/bud-arch.2157

  7. Jaśkowski, Piotr (2008): Metoda projektowania struktury systemu wykonawczego przedsięwzięcia budowlanego z zastosowaniem algorytmu ewolucyjnego. Designing the structure of a construction project operating system using evolutionary algorithm. Dans: Budownictwo i Architektura, v. 2, n. 1 (juin 2008).

    https://doi.org/10.35784/bud-arch.2310

  8. Jaśkowski, Piotr / Biruk, Slawomir (2020): Scheduling of Repetitive Construction Processes with Concurrent Work of Similarly Specialized Crews. Dans: Journal of Civil Engineering and Management, v. 26, n. 6 (8 juin 2020).

    https://doi.org/10.3846/jcem.2020.12914

  9. Tomczak, Michał / Jaśkowski, Piotr (2020): New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects. Dans: Journal of Construction Engineering and Management, v. 146, n. 5 (mai 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001824

  10. Jaśkowski, Piotr / Biruk, Slawomir (2018): Reducing Renewable Resource Demand Fluctuation Using Soft Precedence Relations in Project Scheduling. Dans: Journal of Civil Engineering and Management, v. 24, n. 4 (juillet 2018).

    https://doi.org/10.3846/jcem.2018.3043

  11. Jaśkowski, Piotr / Sobotka, Anna (2004): Scheduling Construction Projects With Resources Accessibility Limited and Changeable in Time. Dans: Journal of Civil Engineering and Management, v. 10, n. 4 (décembre 2004).

    https://doi.org/10.3846/13923730.2004.9636319

  12. Biruk, Slawomir / Jaśkowski, Piotr (2017): Optimization of Vertical Formwork Layout Plans Using Mixed Integer Linear Programming. Dans: International Journal of Civil Engineering, v. 15, n. 2 (janvier 2017).

    https://doi.org/10.1007/s40999-016-0090-6

  13. Tomczak, Michał / Jaśkowski, Piotr (2017): Application of Type-2 Interval Fuzzy Sets to Contractor Qualification Process. Dans: KSCE Journal of Civil Engineering, v. 22, n. 8 (novembre 2017).

    https://doi.org/10.1007/s12205-017-0431-2

  14. Jaśkowski, Piotr / Biruk, Slawomir / Bucon, Robert (2010): Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment. Dans: Automation in Construction, v. 19, n. 2 (mars 2010).

    https://doi.org/10.1016/j.autcon.2009.12.014

  15. Jaśkowski, Piotr / Sobotka, Anna (2006): Scheduling Construction Projects Using Evolutionary Algorithm. Dans: Journal of Construction Engineering and Management, v. 132, n. 8 (août 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:8(861)

  16. Jaśkowski, Piotr / Sobotka, Anna / Czarnigowska, Agata (2018): Decision model for planning material supply channels in construction. Dans: Automation in Construction, v. 90 (juin 2018).

    https://doi.org/10.1016/j.autcon.2018.02.026

  17. Jaśkowski, Piotr / Czarnigowska, Agata / Tokarski, Zbigniew / Sobotka, Anna (2015): The Simulation for selecting road works equipment. Dans: The Baltic Journal of Road and Bridge Engineering, v. 10, n. 3 (septembre 2015).

    https://doi.org/10.3846/bjrbe.2015.27

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine