- Customized particle swarm optimization for harmonizing multi-section construction projects. In: Automation in Construction, v. 162 (Juni 2024). (2024):
- Scheduling Repetitive Construction Projects: Structured Literature Review. In: Journal of Civil Engineering and Management, v. 28, n. 6 (27 Mai 2022). (2022):
- Harmonizing construction processes in repetitive construction projects with multiple buildings. In: Automation in Construction, v. 139 (Juli 2022). (2022):
- Selection of subcontractors using ordinal ranking methods based on Condorcet approach. In: Budownictwo i Architektura, v. 15, n. 4 (Dezember 2016). (2016):
- Repetitive construction processes scheduling using mixed-integer linear programming. In: Budownictwo i Architektura, v. 14, n. 2 (Juni 2015). (2015):
- Dobór elementów deskowania ścian z uwzględnieniem kryteriów ekonomicznych. Economic criteria for the selection of wall formwork. In: Budownictwo i Architektura, v. 12, n. 1 (März 2013). (2013):
- (2008): Metoda projektowania struktury systemu wykonawczego przedsięwzięcia budowlanego z zastosowaniem algorytmu ewolucyjnego. Designing the structure of a construction project operating system using evolutionary algorithm. In: Budownictwo i Architektura, v. 2, n. 1 (Juni 2008).
- Scheduling of Repetitive Construction Processes with Concurrent Work of Similarly Specialized Crews. In: Journal of Civil Engineering and Management, v. 26, n. 6 (8 Juni 2020). (2020):
- New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects. In: Journal of Construction Engineering and Management, v. 146, n. 5 (Mai 2020). (2020):
- Reducing Renewable Resource Demand Fluctuation Using Soft Precedence Relations in Project Scheduling. In: Journal of Civil Engineering and Management, v. 24, n. 4 (Juli 2018). (2018):
- Scheduling Construction Projects With Resources Accessibility Limited and Changeable in Time. In: Journal of Civil Engineering and Management, v. 10, n. 4 (Dezember 2004). (2004):
- (2017): Optimization of Vertical Formwork Layout Plans Using Mixed Integer Linear Programming. In: International Journal of Civil Engineering, v. 15, n. 2 (Januar 2017).
- Application of Type-2 Interval Fuzzy Sets to Contractor Qualification Process. In: KSCE Journal of Civil Engineering, v. 22, n. 8 (November 2017). (2017):
- Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment. In: Automation in Construction, v. 19, n. 2 (März 2010). (2010):
- Scheduling Construction Projects Using Evolutionary Algorithm. In: Journal of Construction Engineering and Management, v. 132, n. 8 (August 2006). (2006):
- Decision model for planning material supply channels in construction. In: Automation in Construction, v. 90 (Juni 2018). (2018):
- The Simulation for selecting road works equipment. In: The Baltic Journal of Road and Bridge Engineering, v. 10, n. 3 (September 2015). (2015):