0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Guo, Sy-Jye / Wei, Taibing (2016): Cost-effective energy saving measures based on BIM technology: Case study at National Taiwan University. In: Energy and Buildings, v. 127 (September 2016).

    https://doi.org/10.1016/j.enbuild.2016.06.015

  2. Lu, I-Feng / Guo, Sy-Jye / Pan, Yu-Jhe (2010): Owner-Controlled Insurance Program and Construction Project Management for Taiwan High Speed Rail Project. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (October 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000034

  3. Li, Chang-Sian / Guo, Sy-Jye (2012): Life Cycle Cost Analysis of Maintenance Costs and Budgets for University Buildings in Taiwan. In: Journal of Asian Architecture and Building Engineering, v. 11, n. 1 (May 2012).

    https://doi.org/10.3130/jaabe.11.87

  4. Chiang, Li-Wei / Guo, Sy-Jye / Chang, Chih-Yuan / Lo, Tzu-Ping (2016): The Development of a Diagnostic Model for the Deterioration of External Wall Tiles of Aged Buildings in Taiwan. In: Journal of Asian Architecture and Building Engineering, v. 15, n. 1 (January 2016).

    https://doi.org/10.3130/jaabe.15.111

  5. Lu, I-Feng / Guo, Sy-Jye / Pan, Yu-Jhe (2011): Construction Project Management and Insurance Program for Taiwan High Speed Rail Project. In: Leadership and Management in Engineering (ASCE), v. 11, n. 1 (January 2011).

    https://doi.org/10.1061/(asce)lm.1943-5630.0000088

  6. Guo, Sy-Jye / Tucker, R. L. (1996): A generic cost-concern matrix for identifying automation needs in construction. In: Automation in Construction, v. 5, n. 2 (May 1996).

    https://doi.org/10.1016/0926-5805(95)00022-4

  7. Guo, Sy-Jye / Chen, Jung-Hsing / Chiu, Chia-Hsin (2017): Fuzzy duration forecast model for wind turbine construction project subject to the impact of wind uncertainty. In: Automation in Construction, v. 81 (September 2017).

    https://doi.org/10.1016/j.autcon.2017.03.009

  8. Guo, Sy-Jye (2002): Identification and Resolution of Work Space Conflicts in Building Construction. In: Journal of Construction Engineering and Management, v. 128, n. 4 (August 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:4(287)

  9. Guo, Sy-Jye (2001): Integrating CAD and schedule for identification and resolution of work space conflicts between subcontractors. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 5 (October 2001).

    https://doi.org/10.1139/l01-032

  10. Guo, Sy-Jye (2001): Analysis of cycle excavation and productivity of large-scale rock tunnel projects - lesson learned in Taiwan. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 1 (February 2001).

    https://doi.org/10.1139/cjce-28-1-26

  11. Guo, Sy-Jye (2001): Analysis of cycle excavation and productivity of large-scale rock tunnel projects - lesson learned in Taiwan. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 1 (February 2001).

    https://doi.org/10.1139/l00-064

  12. Chang, Chih-Yuan / Huang, Shyh-Meng / Guo, Sy-Jye (2007): Medical Records for Building Health Management. In: Journal of Architectural Engineering (ASCE), v. 13, n. 3 (September 2007).

    https://doi.org/10.1061/(asce)1076-0431(2007)13:3(162)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine