0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Guo, Sy-Jye / Wei, Taibing (2016): Cost-effective energy saving measures based on BIM technology: Case study at National Taiwan University. Dans: Energy and Buildings, v. 127 (septembre 2016).

    https://doi.org/10.1016/j.enbuild.2016.06.015

  2. Lu, I-Feng / Guo, Sy-Jye / Pan, Yu-Jhe (2010): Owner-Controlled Insurance Program and Construction Project Management for Taiwan High Speed Rail Project. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 4 (octobre 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000034

  3. Li, Chang-Sian / Guo, Sy-Jye (2012): Life Cycle Cost Analysis of Maintenance Costs and Budgets for University Buildings in Taiwan. Dans: Journal of Asian Architecture and Building Engineering, v. 11, n. 1 (mai 2012).

    https://doi.org/10.3130/jaabe.11.87

  4. Chiang, Li-Wei / Guo, Sy-Jye / Chang, Chih-Yuan / Lo, Tzu-Ping (2016): The Development of a Diagnostic Model for the Deterioration of External Wall Tiles of Aged Buildings in Taiwan. Dans: Journal of Asian Architecture and Building Engineering, v. 15, n. 1 (janvier 2016).

    https://doi.org/10.3130/jaabe.15.111

  5. Lu, I-Feng / Guo, Sy-Jye / Pan, Yu-Jhe (2011): Construction Project Management and Insurance Program for Taiwan High Speed Rail Project. Dans: Leadership and Management in Engineering (ASCE), v. 11, n. 1 (janvier 2011).

    https://doi.org/10.1061/(asce)lm.1943-5630.0000088

  6. Guo, Sy-Jye / Tucker, R. L. (1996): A generic cost-concern matrix for identifying automation needs in construction. Dans: Automation in Construction, v. 5, n. 2 (mai 1996).

    https://doi.org/10.1016/0926-5805(95)00022-4

  7. Guo, Sy-Jye / Chen, Jung-Hsing / Chiu, Chia-Hsin (2017): Fuzzy duration forecast model for wind turbine construction project subject to the impact of wind uncertainty. Dans: Automation in Construction, v. 81 (septembre 2017).

    https://doi.org/10.1016/j.autcon.2017.03.009

  8. Guo, Sy-Jye (2002): Identification and Resolution of Work Space Conflicts in Building Construction. Dans: Journal of Construction Engineering and Management, v. 128, n. 4 (août 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:4(287)

  9. Guo, Sy-Jye (2001): Integrating CAD and schedule for identification and resolution of work space conflicts between subcontractors. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 5 (octobre 2001).

    https://doi.org/10.1139/l01-032

  10. Guo, Sy-Jye (2001): Analysis of cycle excavation and productivity of large-scale rock tunnel projects - lesson learned in Taiwan. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 1 (février 2001).

    https://doi.org/10.1139/cjce-28-1-26

  11. Guo, Sy-Jye (2001): Analysis of cycle excavation and productivity of large-scale rock tunnel projects - lesson learned in Taiwan. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 1 (février 2001).

    https://doi.org/10.1139/l00-064

  12. Chang, Chih-Yuan / Huang, Shyh-Meng / Guo, Sy-Jye (2007): Medical Records for Building Health Management. Dans: Journal of Architectural Engineering (ASCE), v. 13, n. 3 (septembre 2007).

    https://doi.org/10.1061/(asce)1076-0431(2007)13:3(162)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine