A generic cost-concern matrix for identifying automation needs in construction
Author(s): |
Sy-Jye Guo
R. L. Tucker |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, May 1996, n. 2, v. 5 |
Page(s): | 91-104 |
DOI: | 10.1016/0926-5805(95)00022-4 |
- About this
data sheet - Reference-ID
10188666 - Published on:
10/12/2018 - Last updated on:
10/12/2018