0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Paul M. Goodrum ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Nasir, Hassan / Haas, Carl T. / Caldas, Carlos H. / Goodrum, Paul M. (2016): An Integrated Productivity-Practices Implementation Index for Planning the Execution of Infrastructure Projects. In: Journal of Infrastructure Systems, v. 22, n. 2 (June 2016).

    https://doi.org/10.1061/(asce)is.1943-555x.0000275

  2. Minooei, Farzad / Goodrum, Paul M. / Taylor, Timothy R. B. (2020): Young Talent Motivations to Pursue Craft Careers in Construction: The Theory of Planned Behavior. In: Journal of Construction Engineering and Management, v. 146, n. 7 (July 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001867

  3. Jin, Haifeng / Nahangi, Mohammad / Goodrum, Paul M. / Yuan, Yongbo (2020): Multiobjective Optimization for Scaffolding Space Planning in Industrial Piping Construction Using Model-Based Simulation Programming. In: Journal of Computing in Civil Engineering, v. 34, n. 1 (January 2020).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000861

  4. Shan, Yongwei / Zhai, Dong / Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos H. (2016): Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000375

  5. Karimi, Hossein / Taylor, Timothy R. B. / Goodrum, Paul M. / Srinivasan, Cidambi (2016): Quantitative analysis of the impact of craft worker availability on construction project safety performance. In: Construction Innovation, v. 16, n. 3 (July 2016).

    https://doi.org/10.1108/ci-10-2015-0050

  6. Albattah, Mohammed A. / Goodrum, Paul M. / Taylor, Timothy R. B. (2019): New Metric of Workforce Availability among Construction Occupations and Regions. In: Practice Periodical on Structural Design and Construction, v. 24, n. 2 (May 2019).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000413

  7. Allmon, Eric / Haas, Carl T. / Borcherding, John D. / Goodrum, Paul M. (2000): U.S. Construction Labor Productivity Trends, 1970–1998. In: Journal of Construction Engineering and Management, v. 126, n. 2 (March 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:2(97)

  8. Teicholz, Paul / Goodrum, Paul M. / Haas, Carl T. (2001): U.S. Construction Labor Productivity Trends, 1970–1998. In: Journal of Construction Engineering and Management, v. 127, n. 5 (October 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:5(427)

  9. Caldas, Carlos H. / Kim, Jung-Yeol / Haas, Carl T. / Goodrum, Paul M. / Zhang, Di (2015): Method to Assess the Level of Implementation of Productivity Practices on Industrial Projects. In: Journal of Construction Engineering and Management, v. 141, n. 1 (January 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000919

  10. Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos / Zhai, Dong / Yeiser, Jordan / Homm, Daniel (2011): Model to Predict the Impact of a Technology on Construction Productivity. In: Journal of Construction Engineering and Management, v. 137, n. 9 (September 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000328

  11. Zhai, Dong / Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos H. (2009): Relationship between Automation and Integration of Construction Information Systems and Labor Productivity. In: Journal of Construction Engineering and Management, v. 135, n. 8 (August 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000024

  12. Goodrum, Paul M. / Haas, Carl T. (2002): Partial Factor Productivity and Equipment Technology Change at Activity Level in U.S. Construction Industry. In: Journal of Construction Engineering and Management, v. 128, n. 6 (December 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:6(463)

  13. Karimi, Hossein / Taylor, Timothy R. B. / Dadi, Gabriel B. / Goodrum, Paul M. / Srinivasan, Cidambi (2018): Impact of Skilled Labor Availability on Construction Project Cost Performance. In: Journal of Construction Engineering and Management, v. 144, n. 7 (July 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001512

  14. Goodrum, Paul M. / Haas, Carl T. (2004): Long-Term Impact of Equipment Technology on Labor Productivity in the U.S. Construction Industry at the Activity Level. In: Journal of Construction Engineering and Management, v. 130, n. 1 (February 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:1(124)

  15. Goodrum, Paul M. / Zhai, Dong / Yasin, Mohammed F. (2009): Relationship between Changes in Material Technology and Construction Productivity. In: Journal of Construction Engineering and Management, v. 135, n. 4 (April 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:4(278)

  16. Dai, Jiukun / Goodrum, Paul M. / Maloney, William F. / Srinivasan, Cidambi (2009): Latent Structures of the Factors Affecting Construction Labor Productivity. In: Journal of Construction Engineering and Management, v. 135, n. 5 (May 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:5(397)

  17. Haas, Carl T. / Rodriguez, Ana Maria / Glover, Robert / Goodrum, Paul M. (2001): Implementing a multiskilled workforce. In: Construction Management and Economics, v. 19, n. 6 (October 2001).

    https://doi.org/10.1080/01446190110050936

  18. Goodrum, Paul M. / Gangwar, Manish (2004): The relationship between changes in equipment technology and wages in the US construction industry. In: Construction Management and Economics, v. 22, n. 3 (March 2004).

    https://doi.org/10.1080/0144619032000116543

  19. Jones, Timothy / Shan, Yongwei / Goodrum, Paul M. (2010): An investigation of corporate approaches to sustainability in the US engineering and construction industry. In: Construction Management and Economics, v. 28, n. 9 (September 2010).

    https://doi.org/10.1080/01446191003789465

  20. Albattah, Mohammed / Shan, Yongwei / Goodrum, Paul M. / Taylor, Timothy R. B. (2017): Relationships between cycles of economic expansion in construction and craft workers' job satisfaction and preferences. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 1 (January 2017).

    https://doi.org/10.1139/cjce-2016-0358

  21. Goodrum, Paul M. / Miller, Jeffrey / Sweany, John / Alruwaythi, Omar (2016): Influence of the Format of Engineering Information and Spatial Cognition on Craft-Worker Performance. In: Journal of Construction Engineering and Management, v. 142, n. 9 (September 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001157

  22. Shan, Yongwei / Goodrum, Paul M. / Zhai, Dong / Haas, Carl / Caldas, Carlos H. (2011): The impact of management practices on mechanical construction productivity. In: Construction Management and Economics, v. 29, n. 3 (March 2011).

    https://doi.org/10.1080/01446193.2010.538070

  23. Shan, Yongwei / Kim, Jung Yeol / Goodrum, Paul M. / Caldas, Carlos H. / Haas, Carl (2014): Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 12 (December 2014).

    https://doi.org/10.1139/cjce-2014-0079

  24. Dadi, Gabriel B. / Taylor, Timothy R. B. / Goodrum, Paul M. / Maloney, William F. (2014): Performance of 3D computers and 3D printed models as a fundamental means for spatial engineering information visualization. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 10 (October 2014).

    https://doi.org/10.1139/cjce-2014-0019

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine