0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Paul M. Goodrum ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Shrestha, Saurav / Shan, Yongwei / Goodrum, Paul M. (2024): Identification of Best Practices in Project Bundling for State DOTs Using Semistructured Interviews. In: Journal of Construction Engineering and Management, v. 150, n. 7 (July 2024).

    https://doi.org/10.1061/jcemd4.coeng-13954

  2. Albalawi, Rakan / Goodrum, Paul M. / Albattah, Mohammed A. (2024): Evolution of Multiskilled Craft Professionals and Their Level of Certification in the US Industrial Construction Sector. In: Journal of Management in Engineering (ASCE), v. 40, n. 1 (January 2024).

    https://doi.org/10.1061/jmenea.meeng-5583

  3. Albalawi, Rakan K. / Goodrum, Paul M. / Taylor, Timothy R. B. (2023): Applying the Tier II Construction Management Strategy to Measure the Competency Level among Single and Multiskilled Craft Professionals. In: Buildings, v. 13, n. 5 (27 April 2023).

    https://doi.org/10.3390/buildings13051175

  4. Al-Haddad, Sara / Sears, Matthew / Alruwaythi, Omar / Goodrum, Paul M. (2022): Complexity, Performance, and Search Efficiency: An Eye-Tracking Study on Assembly-Based Tasks among Construction Workers (Pipefitters). In: Buildings, v. 12, n. 12 (1 December 2022).

    https://doi.org/10.3390/buildings12122174

  5. Nasir, Hassan / Ahmed, Hani / Haas, Carl / Goodrum, Paul M. (2013): An analysis of construction productivity differences between Canada and the United States. In: Construction Management and Economics, v. 32, n. 6 (April 2013).

    https://doi.org/10.1080/01446193.2013.848995

  6. Carley, Lynn Ann / Haas, Carl T. / Borcherding, John D. / Goodrum, Paul M. (2003): Experiences with multiskilling among non‐union craft workers in US industrial construction projects. In: Engineering, Construction and Architectural Management, v. 10, n. 6 (December 2003).

    https://doi.org/10.1108/09699980310509345

  7. Goodrum, Paul M. / Wan, Yinggang / Fenouil, Philippe C. (2009): A decision‐making system for accelerating roadway construction. In: Engineering, Construction and Architectural Management, v. 16, n. 2 (February 2009).

    https://doi.org/10.1108/09699980910938000

  8. Dai, Jiukun / Goodrum, Paul M. (2011): Differences in Perspectives regarding Labor Productivity between Spanish- and English-Speaking Craft Workers. In: Journal of Construction Engineering and Management, v. 137, n. 9 (September 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000329

  9. Dadi, Gabriel B. / Goodrum, Paul M. / Taylor, Timothy R. B. / Carswell, C. Melody (2014): Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats. In: Journal of Construction Engineering and Management, v. 140, n. 5 (May 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000827

  10. Dai, Jiukun / Goodrum, Paul M. / Maloney, William F. (2009): Construction Craft Workers' Perceptions of the Factors Affecting Their Productivity. In: Journal of Construction Engineering and Management, v. 135, n. 3 (March 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:3(217)

  11. Gouett, Michael C. / Haas, Carl T. / Goodrum, Paul M. / Caldas, Carlos H. (2011): Activity Analysis for Direct-Work Rate Improvement in Construction. In: Journal of Construction Engineering and Management, v. 137, n. 12 (December 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000375

  12. Taylor, Timothy R. B. / Uddin, Moin / Goodrum, Paul M. / McCoy, Alex / Shan, Yongwei (2012): Change Orders and Lessons Learned: Knowledge from Statistical Analyses of Engineering Change Orders on Kentucky Highway Projects. In: Journal of Construction Engineering and Management, v. 138, n. 12 (December 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000550

  13. Zhang, Di / Haas, Carl T. / Goodrum, Paul M. / Caldas, Carlos H. / Granger, Robin (2012): Construction Small-Projects Rework Reduction for Capital Facilities. In: Journal of Construction Engineering and Management, v. 138, n. 12 (December 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000552

  14. Goodrum, Paul M. (2004): Hispanic and Non-Hispanic Wage Differentials: Implications for United States Construction Industry. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:4(552)

  15. Dyer, Bryan / Goodrum, Paul M. / Viele, Kert (2012): Effects of Omitted Variable Bias on Construction Real Output and Its Implications on Productivity Trends in the United States. In: Journal of Construction Engineering and Management, v. 138, n. 4 (April 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000460

  16. Uddin, Moin / Mahboub, Kamyar C. / Goodrum, Paul M. (2011): Effects of Nonnormal Distributions on Highway Construction Acceptance Pay Factor Calculation. In: Journal of Construction Engineering and Management, v. 137, n. 2 (February 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000268

  17. Thomas, Aaron / Davis, Brad / Dadi, Gabriel B. / Goodrum, Paul M. (2013): Case Study on the Effect of 690 mpa (100 ksi) Steel Reinforcement on Concrete Productivity in Buildings. In: Journal of Construction Engineering and Management, v. 139, n. 11 (November 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000699

  18. Grau, David / Caldas, Carlos H. / Haas, Carl T. / Goodrum, Paul M. / Gong, Jie (2009): Assessing the impact of materials tracking technologies on construction craft productivity. In: Automation in Construction, v. 18, n. 7 (November 2009).

    https://doi.org/10.1016/j.autcon.2009.04.001

  19. Sankaran, Bharathwaj / Nevett, Guillermo / O'Brien, William J. / Goodrum, Paul M. / Johnson, Joshua (2018): Civil Integrated Management: Empirical study of digital practices in highway project delivery and asset management. In: Automation in Construction, v. 87 (March 2018).

    https://doi.org/10.1016/j.autcon.2017.12.006

  20. Goodrum, Paul M. / McLaren, Matt A. / Durfee, Adam (2006): The application of active radio frequency identification technology for tool tracking on construction job sites. In: Automation in Construction, v. 15, n. 3 (May 2006).

    https://doi.org/10.1016/j.autcon.2005.06.004

  21. Wang, Yinggang / Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2009): Analysis of Observed Skill Affinity Patterns and Motivation for Multiskilling among Craft Workers in the U.S. Industrial Construction Sector. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000072

  22. Goodrum, Paul M. / Dai, Jiukun (2005): Differences in Occupational Injuries, Illnesses, and Fatalities among Hispanic and Non-Hispanic Construction Workers. In: Journal of Construction Engineering and Management, v. 131, n. 9 (September 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:9(1021)

  23. Wang, Yinggang / Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2008): Craft Training Issues in American Industrial and Commercial Construction. In: Journal of Construction Engineering and Management, v. 134, n. 10 (October 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:10(795)

  24. Dai, Jiukun / Goodrum, Paul M. / Maloney, William F. (2007): Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity. In: Construction Management and Economics, v. 25, n. 11 (November 2007).

    https://doi.org/10.1080/01446190701598681

  25. Karimi, Hossein / Taylor, Timothy R. B. / Goodrum, Paul M. (2016): Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. In: Construction Management and Economics, v. 35, n. 6 (April 2016).

    https://doi.org/10.1080/01446193.2017.1294257

  26. Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2002): The divergence in aggregate and activity estimates of US construction productivity. In: Construction Management and Economics, v. 20, n. 5 (July 2002).

    https://doi.org/10.1080/01446190210145868

  27. Gangwar, Manish / Goodrum, Paul M. (2005): The effect of time on safety incentive programs in the US construction industry. In: Construction Management and Economics, v. 23, n. 8 (October 2005).

    https://doi.org/10.1080/01446190500184527

  28. Wang, Yinggang / Goodrum, Paul M. / Haas, Carl / Glover, Robert / Vazari, Sharam (2010): Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data. In: Construction Management and Economics, v. 28, n. 12 (December 2010).

    https://doi.org/10.1080/01446193.2010.524238

  29. Dai, Jiukun / Goodrum, Paul M. (2012): Generational differences on craft workers' perceptions of the factors affecting labour productivity. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012).

    https://doi.org/10.1139/l2012-053

  30. Bonham, Dave R. / Goodrum, Paul M. / Littlejohn, Ray / Albattah, Mohammed A. (2017): Application of Data Mining Techniques to Quantify the Relative Influence of Design and Installation Characteristics on Labor Productivity. In: Journal of Construction Engineering and Management, v. 143, n. 8 (August 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001347

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine