-
Shrestha, Saurav / Shan, Yongwei / Goodrum, Paul M. (2024): Identification of Best Practices in Project Bundling for State DOTs Using Semistructured Interviews. In: Journal of Construction Engineering and Management, v. 150, n. 7 (July 2024).
https://doi.org/10.1061/jcemd4.coeng-13954
-
Albalawi, Rakan / Goodrum, Paul M. / Albattah, Mohammed A. (2024): Evolution of Multiskilled Craft Professionals and Their Level of Certification in the US Industrial Construction Sector. In: Journal of Management in Engineering (ASCE), v. 40, n. 1 (January 2024).
https://doi.org/10.1061/jmenea.meeng-5583
-
Albalawi, Rakan K. / Goodrum, Paul M. / Taylor, Timothy R. B. (2023): Applying the Tier II Construction Management Strategy to Measure the Competency Level among Single and Multiskilled Craft Professionals. In: Buildings, v. 13, n. 5 (27 April 2023).
https://doi.org/10.3390/buildings13051175
-
Al-Haddad, Sara / Sears, Matthew / Alruwaythi, Omar / Goodrum, Paul M. (2022): Complexity, Performance, and Search Efficiency: An Eye-Tracking Study on Assembly-Based Tasks among Construction Workers (Pipefitters). In: Buildings, v. 12, n. 12 (1 December 2022).
https://doi.org/10.3390/buildings12122174
-
Nasir, Hassan / Ahmed, Hani / Haas, Carl / Goodrum, Paul M. (2013): An analysis of construction productivity differences between Canada and the United States. In: Construction Management and Economics, v. 32, n. 6 (April 2013).
https://doi.org/10.1080/01446193.2013.848995
-
Carley, Lynn Ann / Haas, Carl T. / Borcherding, John D. / Goodrum, Paul M. (2003): Experiences with multiskilling among non‐union craft workers in US industrial construction projects. In: Engineering, Construction and Architectural Management, v. 10, n. 6 (December 2003).
https://doi.org/10.1108/09699980310509345
-
Goodrum, Paul M. / Wan, Yinggang / Fenouil, Philippe C. (2009): A decision‐making system for accelerating roadway construction. In: Engineering, Construction and Architectural Management, v. 16, n. 2 (February 2009).
https://doi.org/10.1108/09699980910938000
-
Dai, Jiukun / Goodrum, Paul M. (2011): Differences in Perspectives regarding Labor Productivity between Spanish- and English-Speaking Craft Workers. In: Journal of Construction Engineering and Management, v. 137, n. 9 (September 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000329
-
Dadi, Gabriel B. / Goodrum, Paul M. / Taylor, Timothy R. B. / Carswell, C. Melody (2014): Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats. In: Journal of Construction Engineering and Management, v. 140, n. 5 (May 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000827
-
Dai, Jiukun / Goodrum, Paul M. / Maloney, William F. (2009): Construction Craft Workers' Perceptions of the Factors Affecting Their Productivity. In: Journal of Construction Engineering and Management, v. 135, n. 3 (March 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:3(217)
-
Gouett, Michael C. / Haas, Carl T. / Goodrum, Paul M. / Caldas, Carlos H. (2011): Activity Analysis for Direct-Work Rate Improvement in Construction. In: Journal of Construction Engineering and Management, v. 137, n. 12 (December 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000375
-
Taylor, Timothy R. B. / Uddin, Moin / Goodrum, Paul M. / McCoy, Alex / Shan, Yongwei (2012): Change Orders and Lessons Learned: Knowledge from Statistical Analyses of Engineering Change Orders on Kentucky Highway Projects. In: Journal of Construction Engineering and Management, v. 138, n. 12 (December 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000550
-
Zhang, Di / Haas, Carl T. / Goodrum, Paul M. / Caldas, Carlos H. / Granger, Robin (2012): Construction Small-Projects Rework Reduction for Capital Facilities. In: Journal of Construction Engineering and Management, v. 138, n. 12 (December 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000552
-
Goodrum, Paul M. (2004): Hispanic and Non-Hispanic Wage Differentials: Implications for United States Construction Industry. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:4(552)
-
Dyer, Bryan / Goodrum, Paul M. / Viele, Kert (2012): Effects of Omitted Variable Bias on Construction Real Output and Its Implications on Productivity Trends in the United States. In: Journal of Construction Engineering and Management, v. 138, n. 4 (April 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000460
-
Uddin, Moin / Mahboub, Kamyar C. / Goodrum, Paul M. (2011): Effects of Nonnormal Distributions on Highway Construction Acceptance Pay Factor Calculation. In: Journal of Construction Engineering and Management, v. 137, n. 2 (February 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000268
-
Thomas, Aaron / Davis, Brad / Dadi, Gabriel B. / Goodrum, Paul M. (2013): Case Study on the Effect of 690 mpa (100 ksi) Steel Reinforcement on Concrete Productivity in Buildings. In: Journal of Construction Engineering and Management, v. 139, n. 11 (November 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000699
-
Grau, David / Caldas, Carlos H. / Haas, Carl T. / Goodrum, Paul M. / Gong, Jie (2009): Assessing the impact of materials tracking technologies on construction craft productivity. In: Automation in Construction, v. 18, n. 7 (November 2009).
https://doi.org/10.1016/j.autcon.2009.04.001
-
Sankaran, Bharathwaj / Nevett, Guillermo / O'Brien, William J. / Goodrum, Paul M. / Johnson, Joshua (2018): Civil Integrated Management: Empirical study of digital practices in highway project delivery and asset management. In: Automation in Construction, v. 87 (March 2018).
https://doi.org/10.1016/j.autcon.2017.12.006
-
Goodrum, Paul M. / McLaren, Matt A. / Durfee, Adam (2006): The application of active radio frequency identification technology for tool tracking on construction job sites. In: Automation in Construction, v. 15, n. 3 (May 2006).
https://doi.org/10.1016/j.autcon.2005.06.004
-
Wang, Yinggang / Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2009): Analysis of Observed Skill Affinity Patterns and Motivation for Multiskilling among Craft Workers in the U.S. Industrial Construction Sector. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000072
-
Goodrum, Paul M. / Dai, Jiukun (2005): Differences in Occupational Injuries, Illnesses, and Fatalities among Hispanic and Non-Hispanic Construction Workers. In: Journal of Construction Engineering and Management, v. 131, n. 9 (September 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:9(1021)
-
Wang, Yinggang / Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2008): Craft Training Issues in American Industrial and Commercial Construction. In: Journal of Construction Engineering and Management, v. 134, n. 10 (October 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:10(795)
-
Dai, Jiukun / Goodrum, Paul M. / Maloney, William F. (2007): Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity. In: Construction Management and Economics, v. 25, n. 11 (November 2007).
https://doi.org/10.1080/01446190701598681
-
Karimi, Hossein / Taylor, Timothy R. B. / Goodrum, Paul M. (2016): Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. In: Construction Management and Economics, v. 35, n. 6 (April 2016).
https://doi.org/10.1080/01446193.2017.1294257
-
Goodrum, Paul M. / Haas, Carl T. / Glover, Robert W. (2002): The divergence in aggregate and activity estimates of US construction productivity. In: Construction Management and Economics, v. 20, n. 5 (July 2002).
https://doi.org/10.1080/01446190210145868
-
Gangwar, Manish / Goodrum, Paul M. (2005): The effect of time on safety incentive programs in the US construction industry. In: Construction Management and Economics, v. 23, n. 8 (October 2005).
https://doi.org/10.1080/01446190500184527
-
Wang, Yinggang / Goodrum, Paul M. / Haas, Carl / Glover, Robert / Vazari, Sharam (2010): Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data. In: Construction Management and Economics, v. 28, n. 12 (December 2010).
https://doi.org/10.1080/01446193.2010.524238
-
Dai, Jiukun / Goodrum, Paul M. (2012): Generational differences on craft workers' perceptions of the factors affecting labour productivity. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012).
https://doi.org/10.1139/l2012-053
-
Bonham, Dave R. / Goodrum, Paul M. / Littlejohn, Ray / Albattah, Mohammed A. (2017): Application of Data Mining Techniques to Quantify the Relative Influence of Design and Installation Characteristics on Labor Productivity. In: Journal of Construction Engineering and Management, v. 143, n. 8 (August 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001347