0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Min-Yuan Cheng ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Cheng, Min-Yuan / Khitam, Akhmad F.K. / Kueh, Yi-Boon (2024): Risk score inference for bridge maintenance projects using genetic fuzzy weighted pyramid operation tree. In: Automation in Construction, v. 165 (September 2024).

    https://doi.org/10.1016/j.autcon.2024.105488

  2. Cheng, Min-Yuan / Vu, Quoc-Tuan / Teng, Ren-Kwei (2024): Real-time risk assessment of multi-parameter induced fall accidents at construction sites. In: Automation in Construction, v. 162 (June 2024).

    https://doi.org/10.1016/j.autcon.2024.105409

  3. Cheng, Min-Yuan / Khitam, Akhmad F. K. / Wang, Nan-Chieh (2023): Self-Tuning Inference Model for Settlement in Shield Tunneling: A Case Study of the Taipei Mass Rapid Transit System’s Songshan Line. In: Structural Control and Health Monitoring, v. 2023 (February 2023).

    https://doi.org/10.1155/2023/6780235

  4. Chen, Cheng-Cheng / Giduquio, Marnie B. / Liu Chang, Shih-Chieh / Cheng, Min-Yuan (2020): Punching shear capacity of RC slab-CFT column connections. In: Engineering Structures, v. 218 (September 2020).

    https://doi.org/10.1016/j.engstruct.2020.110785

  5. Cheng, Min-Yuan / Chang, Yu-Han / Korir, Dorcas (2019): Novel Approach to Estimating Schedule to Completion in Construction Projects Using Sequence and Nonsequence Learning. In: Journal of Construction Engineering and Management, v. 145, n. 11 (November 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001697

  6. Cheng, Min-Yuan / Wibowo, Dedy Kurniawan / Prayogo, Doddy / Roy, Andreas F. V. (2015): Predicting Productivity Loss Caused By Change Orders Using the Evolutionary Fuzzy Support Vector Machine Inference Model. In: Journal of Civil Engineering and Management, v. 21, n. 7 (July 2015).

    https://doi.org/10.3846/13923730.2014.893922

  7. Cheng, Min-Yuan / Chen, Ching-Shan (2014): Preliminary Planning Efficiency Evaluation for School Buildings Considering the Tradeoffs of Moop and Planning Preferences. In: Journal of Civil Engineering and Management, v. 20, n. 2 (April 2014).

    https://doi.org/10.3846/13923730.2013.801890

  8. Cheng, Min-Yuan / Huang, Chin-Chi / Van Roy, Andreas Franskie (2014): Predicting Project Success in Construction Using an Evolutionary Gaussian Process Inference Model. In: Journal of Civil Engineering and Management, v. 19 (January 2014).

    https://doi.org/10.3846/13923730.2013.801919

  9. Su, Cheng-Wei / Cheng, Min-Yuan / Lin, Feng-Bor (2006): Simulation-enhanced Approach for Ranking Major Transport Projects. In: Journal of Civil Engineering and Management, v. 12, n. 4 (December 2006).

    https://doi.org/10.3846/13923730.2006.9636405

  10. Giduquio, Marnie B. / Cheng, Min-Yuan / Dlamini, Langa S. (2019): Reexamination of Strength and Deformation of Corner Slab-Column Connection with Varied Slab Reinforcement Ratio. In: ACI Structural Journal, v. 116, n. 1 (January 2019).

    https://doi.org/10.14359/51712276

  11. Cheng, Min-Yuan / Chiu, Yung-Fang / Chiu, Chien-Kuo / Prayogo, Doddy / Wu, Yu-Wei / Hsu, Zih-Long / Lin, Cheng-Hsuan (2019): Risk-based maintenance strategy for deteriorating bridges using a hybrid computational intelligence technique: a case study. In: Structure and Infrastructure Engineering, v. 15, n. 2 (January 2019).

    https://doi.org/10.1080/15732479.2018.1547767

  12. Cheng, Min-Yuan / Giduquio, Marnie B. (2014): Seismic Design Issue of Corner Slab-Column Connection. In: Journal of Earthquake Engineering, v. 18, n. 1 ( 2014).

    https://doi.org/10.1080/13632469.2013.816644

  13. Cheng, Min-Yuan / Tran, Duc-Hoc (2015): Opposition-Based Multiple-Objective Differential Evolution to Solve the Time–Cost–Environment Impact Trade-Off Problem in Construction Projects. In: Journal of Computing in Civil Engineering, v. 29, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000386

  14. Cheng, Min-Yuan / Cao, Minh-Tu / Wu, Yu-Wei (2015): Predicting Equilibrium Scour Depth at Bridge Piers Using Evolutionary Radial Basis Function Neural Network. In: Journal of Computing in Civil Engineering, v. 29, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000380

  15. Cheng, Min-Yuan / Prayogo, Doddy / Wu, Yu-Wei (2014): Novel Genetic Algorithm-Based Evolutionary Support Vector Machine for Optimizing High-Performance Concrete Mixture. In: Journal of Computing in Civil Engineering, v. 28, n. 4 (July 2014).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000347

  16. Cheng, Min-Yuan / Hoang, Nhat-Duc (2014): Risk Score Inference for Bridge Maintenance Project Using Evolutionary Fuzzy Least Squares Support Vector Machine. In: Journal of Computing in Civil Engineering, v. 28, n. 3 (May 2014).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000275

  17. Cheng, Min-Yuan / Prayogo, Doddy / Tran, Duc-Hoc (2016): Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search. In: Journal of Computing in Civil Engineering, v. 30, n. 3 (May 2016).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000512

  18. Liao, Kuo-Wei / Cheng, Min-Yuan / Chiu, Yung-Fang / Lee, Jin-Han (2016): Preliminary bridge health evaluation using the pier vibration frequency. In: Construction and Building Materials, v. 102 (January 2016).

    https://doi.org/10.1016/j.conbuildmat.2015.11.011

  19. Chou, Jui-Sheng / Cheng, Min-Yuan / Hsieh, Yo-Min / Yang, I-Tung / Hsu, Hsin-Ting (2019): Optimal path planning in real time for dynamic building fire rescue operations using wireless sensors and visual guidance. In: Automation in Construction, v. 99 (March 2019).

    https://doi.org/10.1016/j.autcon.2018.11.020

  20. Cheng, Min-Yuan / Wu, Yu-Wei / Wu, Ching-Fang (2010): Project success prediction using an evolutionary support vector machine inference model. In: Automation in Construction, v. 19, n. 3 (May 2010).

    https://doi.org/10.1016/j.autcon.2009.12.003

  21. Cheng, Min-Yuan / O'Connor, James T. (1994): Site layout of construction temporary facilities using an enhanced-geographic information system (GIS). In: Automation in Construction, v. 3, n. 1 (May 1994).

    https://doi.org/10.1016/0926-5805(94)90028-0

  22. Cheng, Min-Yuan / Wu, Yu-Wei / Chen, Kuan-Lin (2012): Risk Preference Based Support Vector Machine Inference Model for Slope Collapse Prediction. In: Automation in Construction, v. 22 (March 2012).

    https://doi.org/10.1016/j.autcon.2011.06.015

  23. Cheng, Min-Yuan / Hoang, Nhat-Duc (2014): A novel groutability estimation model for ground improvement projects in sandy silt soil based on Bayesian framework. In: Tunnelling and Underground Space Technology, v. 43 (July 2014).

    https://doi.org/10.1016/j.tust.2014.07.001

  24. Lien, Li-Chuan / Cheng, Min-Yuan (2014): Particle bee algorithm for tower crane layout with material quantity supply and demand optimization. In: Automation in Construction, v. 45 (September 2014).

    https://doi.org/10.1016/j.autcon.2014.05.002

  25. Cheng, Min-Yuan / Tran, Duc-Hoc (2015): Opposition-based Multiple Objective Differential Evolution (OMODE) for optimizing work shift schedules. In: Automation in Construction, v. 55 (July 2015).

    https://doi.org/10.1016/j.autcon.2015.03.021

  26. Cheng, Min-Yuan / Su, Cheng-Wei / You, Horng-Yuh (2003): Optimal Project Organizational Structure for Construction Management. In: Journal of Construction Engineering and Management, v. 129, n. 1 (February 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:1(70)

  27. Cheng, Min-Yuan / Tsai, Min-Hsiu (2003): Reengineering of Construction Management Process. In: Journal of Construction Engineering and Management, v. 129, n. 1 (February 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:1(105)

  28. Cheng, Min-Yuan / Ko, Chien-Ho (2003): Object-Oriented Evolutionary Fuzzy Neural Inference System for Construction Management. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(461)

  29. Prayogo, Doddy / Cheng, Min-Yuan / Wong, Foek Tjong / Tjandra, Daniel / Tran, Duc-Hoc (2018): Optimization model for construction project resource leveling using a novel modified symbiotic organisms search. In: Asian Journal of Civil Engineering, v. 19, n. 5 (April 2018).

    https://doi.org/10.1007/s42107-018-0048-x

  30. Cheng, Min-Yuan / Parra-Montesinos, Gustavo J. / Shield, Carol K. (2010): Shear Strength and Drift Capacity of Fiber-Reinforced Concrete Slab-Column Connections Subjected to Biaxial Displacements. In: Journal of Structural Engineering (ASCE), v. 136, n. 9 (September 2010).

    https://doi.org/10.1061/(asce)st.1943-541x.0000213

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine