Multiobjective Dynamic-Guiding PSO for Optimizing Work Shift Schedules
Author(s): |
Min-Yuan Cheng
Kuo-Yu Huang Merciawati Hutomo |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2018, n. 9, v. 144 |
Page(s): | 04018089 |
DOI: | 10.1061/(asce)co.1943-7862.0001548 |
- About this
data sheet - Reference-ID
10174835 - Published on:
11/12/2018 - Last updated on:
11/12/2018