0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Gitomarsono, Jessica / Cheng, Min-Yuan / Giduquio, Marnie B. (2024): Cyclic Behavior of Reinforced Concrete Flexural Members to Changing Design Parameters. Dans: ACI Structural Journal, v. 121, n. 2 (mars 2024).

    https://doi.org/10.14359/51740244

  2. Cheng, Min-Yuan / Sholeh, Moh Nur / Harsono, Kenneth (2023): Automated vision-based post-earthquake safety assessment for bridges using STF-PointRend and EfficientNetB0. Dans: Structural Health Monitoring, v. 23, n. 2 (juillet 2023).

    https://doi.org/10.1177/14759217231168709

  3. Cheng, Min-Yuan / Khitam, Akhmad F. K. / Tanto, Hongky Haodiwidjaya (2023): Construction worker productivity evaluation using action recognition for foreign labor training and education: A case study of Taiwan. Dans: Automation in Construction, v. 150 (juin 2023).

    https://doi.org/10.1016/j.autcon.2023.104809

  4. Cheng, Min-Yuan / Liao, Kuo-Wei / Chiu, Yung-Fang / Wu, Yu-Wei / Yeh, Shu-Hua / Lin, Ting-Chang (2022): Automated mobile vibration measurement and signal analysis for bridge scour prevention and warning. Dans: Automation in Construction, v. 134 (février 2022).

    https://doi.org/10.1016/j.autcon.2021.104063

  5. Cheng, Min-Yuan / Fang, Yi-Cho / Wang, Chun-Yao (2021): Auto-tuning SOS Algorithm for Two-Dimensional Orthogonal Cutting Optimization. Dans: KSCE Journal of Civil Engineering, v. 25, n. 10 (juillet 2021).

    https://doi.org/10.1007/s12205-021-0522-y

  6. Cheng, Min-Yuan / Fang, Yi-Cho / Chiu, Yung-Fang / Wu, Yu-Wei / Lin, Ting-Chang (2021): Design and Maintenance Information Integration for Concrete Bridge Assessment and Disaster Prevention. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 35, n. 3 (juin 2021).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001576

  7. Cheng, Min-Yuan / Cao, Minh-Tu / Jaya Mendrofa, Aris Yan (2021): Dynamic Feature Selection for Accurately Predicting Construction Productivity Using Symbiotic Organisms Search-Optimized Least Square Support Vector Machine. Dans: Journal of Building Engineering, v. 35 (mars 2021).

    https://doi.org/10.1016/j.jobe.2020.101973

  8. Cheng, Min-Yuan / Hung, Shih-Ching / Lequesne, Rémy D. / Lepage, Andres (2016): Earthquake-Resistant Squat Walls Reinforced with High-Strength Steel. Dans: ACI Structural Journal, v. 113, n. 5 (septembre 2016).

    https://doi.org/10.14359/51688825

  9. Wibowo, Leonardus S. B. / Cheng, Min-Yuan / Huang, Feng-Cheng / Tai, Ting-Yu (2017): Effectiveness of High-Strength Hoops in High-Strength Flexural Members. Dans: ACI Structural Journal, v. 114, n. 4 (juillet 2017).

    https://doi.org/10.14359/51689620

  10. Cheng, Min-Yuan / Chiu, Kuan-Chang / Lien, Li-Chuan / Wu, Yu-Wei / Lin, Jing-Jhe (2016): Economic and energy consumption analysis of smart building – MEGA house. Dans: Building and Environment, v. 100 (mai 2016).

    https://doi.org/10.1016/j.buildenv.2016.02.023

  11. Cheng, Min-Yuan / Tran, Duc-Hoc / Cao, Minh-Tu (2016): Chaotic Initialized Multiple Objective Differential Evolution With Adaptive Mutation Strategy (ca-mode) for Construction Project Time-cost-quality Trade-off. Dans: Journal of Civil Engineering and Management, v. 22, n. 2 (mars 2016).

    https://doi.org/10.3846/13923730.2014.897972

  12. Cheng, Min-Yuan / Hoang, Nhat-Duc / Wu, Yu-Wei (2015): Cash Flow Prediction for Construction Project Using A Novel Adaptive Time-dependent Least Squares Support Vector Machine Inference Model. Dans: Journal of Civil Engineering and Management, v. 21, n. 6 (juin 2015).

    https://doi.org/10.3846/13923730.2014.893906

  13. Cheng, Min-Yuan / Su, Cheng-Wei / Tsai, Ming-Hsiu / Lin, Kuo-Shian (2012): Data Preprocessing for Artificial Neural Network Applications in Prioritizing Railroad Projects – A Practical Experience in Taiwan. Dans: Journal of Civil Engineering and Management, v. 18, n. 4 (septembre 2012).

    https://doi.org/10.3846/13923730.2012.699914

  14. Cheng, Min-Yuan / Hsiang, Chia-Chi / Tsai, Hsing-Chih / Do, Hoang-Linh (2011): Bidding Decision Making for Construction Company Using a Multi-Criteria Prospect Model/ Statybos įmonės apsisprendimas dalyvauti konkurse naudojant daugiakriterinį perspektyvų modelį. Dans: Journal of Civil Engineering and Management, v. 17, n. 3 (septembre 2011).

    https://doi.org/10.3846/13923730.2011.598337

  15. Cheng, Min-Yuan / Giduquio, Marnie B. (2014): Cyclic Behavior of Reinforced Concrete Flexural Members Using High-Strength Flexural Reinforcement. Dans: ACI Structural Journal, v. 111, n. 4 (juillet 2014).

    https://doi.org/10.14359/51686632

  16. Cheng, Min-Yuan / Tran, Duc-Hoc (2015): An efficient hybrid differential evolution based serial method for multimode resource-constrained project scheduling. Dans: KSCE Journal of Civil Engineering, v. 20, n. 1 (février 2015).

    https://doi.org/10.1007/s12205-015-0414-0

  17. Cheng, Min-Yuan / Ko, Chien-Ho (2003): Automated Safety Monitoring and Diagnosis System for Unstable Slopes. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 18, n. 1 (janvier 2003).

    https://doi.org/10.1111/1467-8667.t01-1-00300

  18. Cheng, Min-Yuan / Tsai, Ming-Hsiu (2008): Cross-organization process integration in design–build team. Dans: Automation in Construction, v. 17, n. 2 (janvier 2008).

    https://doi.org/10.1016/j.autcon.2006.12.002

  19. Cheng, Min-Yuan / Tsai, Hsing-Chih / Liu, Chih-Lung (2009): Artificial intelligence approaches to achieve strategic control over project cash flows. Dans: Automation in Construction, v. 18, n. 4 (juillet 2009).

    https://doi.org/10.1016/j.autcon.2008.10.005

  20. Cheng, Min-Yuan / Tsai, Ming-Hsiu / Sutan, Wiraputra (2009): Benchmarking-based process reengineering for construction management. Dans: Automation in Construction, v. 18, n. 5 (août 2009).

    https://doi.org/10.1016/j.autcon.2008.12.004

  21. Cheng, Min-Yuan / Tsai, Hsing-Chih / Lai, Yun-Yan (2009): Construction management process reengineering performance measurements. Dans: Automation in Construction, v. 18, n. 2 (mars 2009).

    https://doi.org/10.1016/j.autcon.2008.07.005

  22. Cheng, Min-Yuan / Wu, Yu-Wei / Chen, Sheng-Jin / Weng, Ming-Chuan (2009): Economic evaluation model for post-earthquake bridge repair/rehabilitation: Taiwan case studies. Dans: Automation in Construction, v. 18, n. 2 (mars 2009).

    https://doi.org/10.1016/j.autcon.2008.08.004

  23. Cheng, Min-Yuan / Chang, Guey-Lin (2001): Automating utility route design and planning through GIS. Dans: Automation in Construction, v. 10, n. 4 (mai 2001).

    https://doi.org/10.1016/s0926-5805(00)00103-5

  24. Cheng, Min-Yuan / Peng, Hsien-Sheng / Wu, Yu-Wei / Chen, Te-Lin (2010): Estimate at Completion for construction projects using Evolutionary Support Vector Machine Inference Model. Dans: Automation in Construction, v. 19, n. 5 (août 2010).

    https://doi.org/10.1016/j.autcon.2010.02.008

  25. Cheng, Min-Yuan / Tsai, Ming-Hsiu / Xiao, Zhi-Wei (2006): Construction management process reengineering: Organizational human resource planning for multiple projects. Dans: Automation in Construction, v. 15, n. 6 (novembre 2006).

    https://doi.org/10.1016/j.autcon.2005.10.014

  26. Cheng, Min-Yuan / Chiu, Kuan-Chang / Hsieh, Yo-Ming / Yang, I-Tung / Chou, Jui-Sheng / Wu, Yu-Wei (2017): BIM integrated smart monitoring technique for building fire prevention and disaster relief. Dans: Automation in Construction, v. 84 (décembre 2017).

    https://doi.org/10.1016/j.autcon.2017.08.027

  27. Cheng, Min-Yuan / Ko, Chien-Ho / Chang, Chih-Hung (2002): Computer-aided DSS for safety monitoring of geotechnical construction. Dans: Automation in Construction, v. 11, n. 4 (juin 2002).

    https://doi.org/10.1016/s0926-5805(01)00059-0

  28. Cheng, Min-Yuan / Ko, Chien-Ho (2002): Computer-aided decision support system for hillside safety monitoring. Dans: Automation in Construction, v. 11, n. 4 (juin 2002).

    https://doi.org/10.1016/s0926-5805(01)00086-3

  29. Ko, Chien-Ho / Cheng, Min-Yuan (2007): Dynamic Prediction of Project Success Using Artificial Intelligence. Dans: Journal of Construction Engineering and Management, v. 133, n. 4 (avril 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:4(316)

  30. Prayogo, Doddy / Cheng, Min-Yuan / Wu, Yu-Wei / Herdany, Albertus Arief / Prayogo, Handy (2018): Differential Big Bang - Big Crunch algorithm for construction-engineering design optimization. Dans: Automation in Construction, v. 85 (janvier 2018).

    https://doi.org/10.1016/j.autcon.2017.10.019

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine