0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

W. Edward Back

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Molad, Clarisse / Back, W. Edward (1995): EDI's role as an enabler for electronic commerce and information integration. In: Engineering, Construction and Architectural Management, v. 2, n. 2 (February 1995).

    https://doi.org/10.1108/eb021005

  2. Back, W. Edward / Sanders, Steve R. (1998): Industry expectations for engineering graduates. In: Engineering, Construction and Architectural Management, v. 5, n. 2 (February 1998).

    https://doi.org/10.1108/eb021068

  3. Grau, David / Back, W. Edward / Mejia-Aguilar, Guillermo (2017): Organizational-Behavior Influence on Cost and Schedule Predictability. In: Journal of Management in Engineering (ASCE), v. 33, n. 5 (September 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000542

  4. Grau, David / Back, W. Edward / Prince, J. Regan (2012): Benefits of On-Site Design to Project Performance Measures. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (July 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000097

  5. George, Ryan / Bell, Lansford C. / Back, W. Edward (2008): Critical Activities in the Front-End Planning Process. In: Journal of Management in Engineering (ASCE), v. 24, n. 2 (April 2008).

    https://doi.org/10.1061/(asce)0742-597x(2008)24:2(66)

  6. Back, W. Edward / Moreau, Karen A. (2000): Cost and Schedule Impacts of Information Management on EPC Process. In: Journal of Management in Engineering (ASCE), v. 16, n. 2 (March 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:2(59)

  7. Back, W. Edward / Maxwell, Donald A. / Isidore, Leroy J. (2000): Activity-Based Costing as a Tool for Process Improvement Evaluations. In: Journal of Management in Engineering (ASCE), v. 16, n. 2 (March 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:2(48)

  8. Back, W. Edward / Bell, Lansford C. (1995): Monte Carlo Simulation as Tool for Process Reengineering. In: Journal of Management in Engineering (ASCE), v. 11, n. 5 (September 1995).

    https://doi.org/10.1061/(asce)0742-597x(1995)11:5(46)

  9. Grau, David / Back, W. Edward / Mejia-Aguilar, Guillermo / Morris, Robert C. (2012): Impact of a Construction Management Educational Intervention on the Expertise and Work Practice of Nonconstruction Engineers. In: Journal of Professional Issues in Engineering Education and Practice, v. 138, n. 1 (January 2012).

    https://doi.org/10.1061/(asce)ei.1943-5541.0000088

  10. Back, W. Edward / Fridley, Kenneth / Morgan, Robert (2012): Incorporation of Recovery Planning into a Student Design Course Following a Tornado. In: Leadership and Management in Engineering (ASCE), v. 12, n. 3 (July 2012).

    https://doi.org/10.1061/(asce)lm.1943-5630.0000176

  11. Grau, David / Back, W. Edward / Prince, J. Regan (2012): Database Expert Planning System for On-Site Design Strategies. In: Journal of Computing in Civil Engineering, v. 26, n. 1 (January 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000109

  12. Back, W. Edward / Boles, Walter W. / Fry, Gary T. (2000): Defining Triangular Probability Distributions from Historical Cost Data. In: Journal of Construction Engineering and Management, v. 126, n. 1 (January 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:1(29)

  13. Barraza, Gabriel A. / Back, W. Edward / Mata, Fernando (2000): Probabilistic Monitoring of Project Performance Using SS-Curves. In: Journal of Construction Engineering and Management, v. 126, n. 2 (March 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:2(142)

  14. Back, W. Edward / Bell, Lansford C. (1995): Quantifying Process Benefits of Electronic Data Management Technologies. In: Journal of Construction Engineering and Management, v. 121, n. 4 (December 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:4(415)

  15. Isidore, Leroy J. / Back, W. Edward (2001): Probabilistic Optimal-Cost Scheduling. In: Journal of Construction Engineering and Management, v. 127, n. 6 (December 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:6(431)

  16. Isidore, Leroy J. / Back, W. Edward (2002): Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration. In: Journal of Construction Engineering and Management, v. 128, n. 3 (June 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:3(211)

  17. Moreau, Karen A. / Back, W. Edward (2000): Improving the design process with information management. In: Automation in Construction, v. 10, n. 1 (November 2000).

    https://doi.org/10.1016/s0926-5805(99)00057-6

  18. Grau, David / Back, W. Edward (2015): Predictability Index: Novel Metric to Assess Cost and Schedule Performance. In: Journal of Construction Engineering and Management, v. 141, n. 12 (December 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000994

  19. Barraza, Gabriel A. / Back, W. Edward / Mata, Fernando (2004): Probabilistic Forecasting of Project Performance Using Stochastic S Curves. In: Journal of Construction Engineering and Management, v. 130, n. 1 (February 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:1(25)

  20. Le Isidore, roy J. / Back, W. Edward / Fry, Gary T. (2001): Integrated probabilistic schedules and estimates from project simulated data. In: Construction Management and Economics, v. 19, n. 4 (July 2001).

    https://doi.org/10.1080/01446190010022677

  21. Macdonald, Rebecca / Back, W. Edward / Johnson, Philip W. (2012): Retrospective Analysis to Identify Trends in Forensic Research. In: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 5 (October 2012).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000290

  22. Maxwell, Donald A. / Back, W. Edward / Toon, Jeffery (1998): Optimization of Crew Configurations Using Activity-Based Costing. In: Journal of Construction Engineering and Management, v. 124, n. 2 (March 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:2(162)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine