Molad, Clarisse / Back, W. Edward (1995): EDI's role as an enabler for electronic commerce and information integration. In: Engineering, Construction and Architectural Management, v. 2, n. 2 (Februar 1995).
https://doi.org/10.1108/eb021005
-
Back, W. Edward / Sanders, Steve R. (1998): Industry expectations for engineering graduates. In: Engineering, Construction and Architectural Management, v. 5, n. 2 (Februar 1998).
https://doi.org/10.1108/eb021068
-
Grau, David / Back, W. Edward / Mejia-Aguilar, Guillermo (2017): Organizational-Behavior Influence on Cost and Schedule Predictability. In: Journal of Management in Engineering (ASCE), v. 33, n. 5 (September 2017).
https://doi.org/10.1061/(asce)me.1943-5479.0000542
-
Grau, David / Back, W. Edward / Prince, J. Regan (2012): Benefits of On-Site Design to Project Performance Measures. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (Juli 2012).
https://doi.org/10.1061/(asce)me.1943-5479.0000097
-
George, Ryan / Bell, Lansford C. / Back, W. Edward (2008): Critical Activities in the Front-End Planning Process. In: Journal of Management in Engineering (ASCE), v. 24, n. 2 (April 2008).
https://doi.org/10.1061/(asce)0742-597x(2008)24:2(66)
-
Back, W. Edward / Moreau, Karen A. (2000): Cost and Schedule Impacts of Information Management on EPC Process. In: Journal of Management in Engineering (ASCE), v. 16, n. 2 (März 2000).
https://doi.org/10.1061/(asce)0742-597x(2000)16:2(59)
-
Back, W. Edward / Maxwell, Donald A. / Isidore, Leroy J. (2000): Activity-Based Costing as a Tool for Process Improvement Evaluations. In: Journal of Management in Engineering (ASCE), v. 16, n. 2 (März 2000).
https://doi.org/10.1061/(asce)0742-597x(2000)16:2(48)
-
Back, W. Edward / Bell, Lansford C. (1995): Monte Carlo Simulation as Tool for Process Reengineering. In: Journal of Management in Engineering (ASCE), v. 11, n. 5 (September 1995).
https://doi.org/10.1061/(asce)0742-597x(1995)11:5(46)
-
Grau, David / Back, W. Edward / Mejia-Aguilar, Guillermo / Morris, Robert C. (2012): Impact of a Construction Management Educational Intervention on the Expertise and Work Practice of Nonconstruction Engineers. In: Journal of Professional Issues in Engineering Education and Practice, v. 138, n. 1 (Januar 2012).
https://doi.org/10.1061/(asce)ei.1943-5541.0000088
-
Back, W. Edward / Fridley, Kenneth / Morgan, Robert (2012): Incorporation of Recovery Planning into a Student Design Course Following a Tornado. In: Leadership and Management in Engineering (ASCE), v. 12, n. 3 (Juli 2012).
https://doi.org/10.1061/(asce)lm.1943-5630.0000176
-
Grau, David / Back, W. Edward / Prince, J. Regan (2012): Database Expert Planning System for On-Site Design Strategies. In: Journal of Computing in Civil Engineering, v. 26, n. 1 (Januar 2012).
https://doi.org/10.1061/(asce)cp.1943-5487.0000109
-
Back, W. Edward / Boles, Walter W. / Fry, Gary T. (2000): Defining Triangular Probability Distributions from Historical Cost Data. In: Journal of Construction Engineering and Management, v. 126, n. 1 (Januar 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:1(29)
-
Barraza, Gabriel A. / Back, W. Edward / Mata, Fernando (2000): Probabilistic Monitoring of Project Performance Using SS-Curves. In: Journal of Construction Engineering and Management, v. 126, n. 2 (März 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:2(142)
-
Back, W. Edward / Bell, Lansford C. (1995): Quantifying Process Benefits of Electronic Data Management Technologies. In: Journal of Construction Engineering and Management, v. 121, n. 4 (Dezember 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:4(415)
-
Isidore, Leroy J. / Back, W. Edward (2001): Probabilistic Optimal-Cost Scheduling. In: Journal of Construction Engineering and Management, v. 127, n. 6 (Dezember 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:6(431)
-
Isidore, Leroy J. / Back, W. Edward (2002): Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration. In: Journal of Construction Engineering and Management, v. 128, n. 3 (Juni 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:3(211)
-
Moreau, Karen A. / Back, W. Edward (2000): Improving the design process with information management. In: Automation in Construction, v. 10, n. 1 (November 2000).
https://doi.org/10.1016/s0926-5805(99)00057-6
-
Grau, David / Back, W. Edward (2015): Predictability Index: Novel Metric to Assess Cost and Schedule Performance. In: Journal of Construction Engineering and Management, v. 141, n. 12 (Dezember 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000994
-
Barraza, Gabriel A. / Back, W. Edward / Mata, Fernando (2004): Probabilistic Forecasting of Project Performance Using Stochastic S Curves. In: Journal of Construction Engineering and Management, v. 130, n. 1 (Februar 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:1(25)
-
Le Isidore, roy J. / Back, W. Edward / Fry, Gary T. (2001): Integrated probabilistic schedules and estimates from project simulated data. In: Construction Management and Economics, v. 19, n. 4 (Juli 2001).
https://doi.org/10.1080/01446190010022677
-
Macdonald, Rebecca / Back, W. Edward / Johnson, Philip W. (2012): Retrospective Analysis to Identify Trends in Forensic Research. In: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 5 (Oktober 2012).
https://doi.org/10.1061/(asce)cf.1943-5509.0000290
-
Maxwell, Donald A. / Back, W. Edward / Toon, Jeffery (1998): Optimization of Crew Configurations Using Activity-Based Costing. In: Journal of Construction Engineering and Management, v. 124, n. 2 (März 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:2(162)