La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Molad, Clarisse / Back, W. Edward (1995): EDI's role as an enabler for electronic commerce and information integration. Dans: Engineering, Construction and Architectural Management, v. 2, n. 2 (février 1995).

    https://doi.org/10.1108/eb021005

  2. Back, W. Edward / Sanders, Steve R. (1998): Industry expectations for engineering graduates. Dans: Engineering, Construction and Architectural Management, v. 5, n. 2 (février 1998).

    https://doi.org/10.1108/eb021068

  3. Grau, David / Back, W. Edward / Mejia-Aguilar, Guillermo (2017): Organizational-Behavior Influence on Cost and Schedule Predictability. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 5 (septembre 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000542

  4. Grau, David / Back, W. Edward / Prince, J. Regan (2012): Benefits of On-Site Design to Project Performance Measures. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 3 (juillet 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000097

  5. George, Ryan / Bell, Lansford C. / Back, W. Edward (2008): Critical Activities in the Front-End Planning Process. Dans: Journal of Management in Engineering (ASCE), v. 24, n. 2 (avril 2008).

    https://doi.org/10.1061/(asce)0742-597x(2008)24:2(66)

  6. Back, W. Edward / Moreau, Karen A. (2000): Cost and Schedule Impacts of Information Management on EPC Process. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 2 (mars 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:2(59)

  7. Back, W. Edward / Maxwell, Donald A. / Isidore, Leroy J. (2000): Activity-Based Costing as a Tool for Process Improvement Evaluations. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 2 (mars 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:2(48)

  8. Back, W. Edward / Bell, Lansford C. (1995): Monte Carlo Simulation as Tool for Process Reengineering. Dans: Journal of Management in Engineering (ASCE), v. 11, n. 5 (septembre 1995).

    https://doi.org/10.1061/(asce)0742-597x(1995)11:5(46)

  9. Grau, David / Back, W. Edward / Mejia-Aguilar, Guillermo / Morris, Robert C. (2012): Impact of a Construction Management Educational Intervention on the Expertise and Work Practice of Nonconstruction Engineers. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 138, n. 1 (janvier 2012).

    https://doi.org/10.1061/(asce)ei.1943-5541.0000088

  10. Back, W. Edward / Fridley, Kenneth / Morgan, Robert (2012): Incorporation of Recovery Planning into a Student Design Course Following a Tornado. Dans: Leadership and Management in Engineering (ASCE), v. 12, n. 3 (juillet 2012).

    https://doi.org/10.1061/(asce)lm.1943-5630.0000176

  11. Grau, David / Back, W. Edward / Prince, J. Regan (2012): Database Expert Planning System for On-Site Design Strategies. Dans: Journal of Computing in Civil Engineering, v. 26, n. 1 (janvier 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000109

  12. Back, W. Edward / Boles, Walter W. / Fry, Gary T. (2000): Defining Triangular Probability Distributions from Historical Cost Data. Dans: Journal of Construction Engineering and Management, v. 126, n. 1 (janvier 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:1(29)

  13. Barraza, Gabriel A. / Back, W. Edward / Mata, Fernando (2000): Probabilistic Monitoring of Project Performance Using SS-Curves. Dans: Journal of Construction Engineering and Management, v. 126, n. 2 (mars 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:2(142)

  14. Back, W. Edward / Bell, Lansford C. (1995): Quantifying Process Benefits of Electronic Data Management Technologies. Dans: Journal of Construction Engineering and Management, v. 121, n. 4 (décembre 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:4(415)

  15. Isidore, Leroy J. / Back, W. Edward (2001): Probabilistic Optimal-Cost Scheduling. Dans: Journal of Construction Engineering and Management, v. 127, n. 6 (décembre 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:6(431)

  16. Isidore, Leroy J. / Back, W. Edward (2002): Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration. Dans: Journal of Construction Engineering and Management, v. 128, n. 3 (juin 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:3(211)

  17. Moreau, Karen A. / Back, W. Edward (2000): Improving the design process with information management. Dans: Automation in Construction, v. 10, n. 1 (novembre 2000).

    https://doi.org/10.1016/s0926-5805(99)00057-6

  18. Grau, David / Back, W. Edward (2015): Predictability Index: Novel Metric to Assess Cost and Schedule Performance. Dans: Journal of Construction Engineering and Management, v. 141, n. 12 (décembre 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000994

  19. Barraza, Gabriel A. / Back, W. Edward / Mata, Fernando (2004): Probabilistic Forecasting of Project Performance Using Stochastic S Curves. Dans: Journal of Construction Engineering and Management, v. 130, n. 1 (février 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:1(25)

  20. Le Isidore, roy J. / Back, W. Edward / Fry, Gary T. (2001): Integrated probabilistic schedules and estimates from project simulated data. Dans: Construction Management and Economics, v. 19, n. 4 (juillet 2001).

    https://doi.org/10.1080/01446190010022677

  21. Macdonald, Rebecca / Back, W. Edward / Johnson, Philip W. (2012): Retrospective Analysis to Identify Trends in Forensic Research. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 5 (octobre 2012).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000290

  22. Maxwell, Donald A. / Back, W. Edward / Toon, Jeffery (1998): Optimization of Crew Configurations Using Activity-Based Costing. Dans: Journal of Construction Engineering and Management, v. 124, n. 2 (mars 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:2(162)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine