0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Lee, Jung Hyun / Ashuri, Baabak (2023): Project Chief Engineer: An Industry Review of a New Position on Design–Build Teams for Major Transportation Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 3 (August 2023).

    https://doi.org/10.1061/jladah.ladr-954

  2. Li, Mingshu / Ashuri, Baabak (2021): Proportional Cox Hazards Model to Quantify the Likelihood of Underestimation in Transportation Projects. In: Journal of Construction Engineering and Management, v. 147, n. 10 (October 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002164

  3. Ashuri, Baabak / Amekudzi-Kennedy, Adjo / Amoaning-Yankson, Stephanie / Liang, Yunping / Cao, Yang (2019): Strategies and Resources for Government Agencies to Utilize Disadvantaged Business Enterprises in Transportation Design-Build Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 4 (November 2019).

    https://doi.org/10.1061/(asce)la.1943-4170.0000317

  4. Gahrooei, Mostafa Reisi / Zhang, Yuna / Ashuri, Baabak / Augenbroe, Godfried (2016): Timing residential photovoltaic investments in the presence of demand uncertainties. In: Sustainable Cities and Society, v. 20 (January 2016).

    https://doi.org/10.1016/j.scs.2015.10.003

  5. Zhang, Limao / Li, Yan / Stephenson, Robert / Ashuri, Baabak (2018): Valuation of energy efficient certificates in buildings. In: Energy and Buildings, v. 158 (January 2018).

    https://doi.org/10.1016/j.enbuild.2017.11.014

  6. Jallan, Yashovardhan / Ashuri, Baabak (2020): Text Mining of the Securities and Exchange Commission Financial Filings of Publicly Traded Construction Firms Using Deep Learning to Identify and Assess Risk. In: Journal of Construction Engineering and Management, v. 146, n. 12 (December 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001932

  7. Cao, Yang / Ashuri, Baabak (2020): Predicting the Volatility of Highway Construction Cost Index Using Long Short-Term Memory. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000784

  8. Ashuri, Baabak / Mostaan, Kia (2015): State of Private Financing in Development of Highway Projects in the United States. In: Journal of Management in Engineering (ASCE), v. 31, n. 6 (November 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000362

  9. Ashuri, Baabak / Lu, Jian / Kashani, Hamed (2011): A real options framework to evaluate investments in toll road projects delivered under the two‐phase development strategy. In: Built Environment Project and Asset Management, v. 1, n. 1 (July 2011).

    https://doi.org/10.1108/20441241111143759

  10. Ashuri, Baabak / Tavakolan, Mehdi (2015): Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning. In: Journal of Computing in Civil Engineering, v. 29, n. 1 (January 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000315

  11. Ashuri, Baabak / Lu, Jian (2010): Time Series Analysis of ENR Construction Cost Index. In: Journal of Construction Engineering and Management, v. 136, n. 11 (November 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000231

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine