Predicting the Volatility of Highway Construction Cost Index Using Long Short-Term Memory
Author(s): |
Yang Cao
Baabak Ashuri |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), July 2020, n. 4, v. 36 |
Page(s): | 04020020 |
DOI: | 10.1061/(asce)me.1943-5479.0000784 |
- About this
data sheet - Reference-ID
10416982 - Published on:
31/03/2020 - Last updated on:
31/03/2020