0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning

Author(s):

Medium: journal article
Language(s): English
Published in: Journal of Computing in Civil Engineering, , n. 1, v. 29
Page(s): 04014026
DOI: 10.1061/(asce)cp.1943-5487.0000315
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)cp.1943-5487.0000315.
  • About this
    data sheet
  • Reference-ID
    10259129
  • Published on:
    30/12/2018
  • Last updated on:
    30/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine