Advertisement
Teupe & Söhne Gerüstbau GmbH
The following reports and case studies provided by "Teupe & Söhne Gerüstbau GmbH" are available:
Scaffolding for the Schlossbachbrücke, Tyrol, during rehabilitation work
The Schlossbach is a tributary of the Inn River in Tyrol. In its upper reaches is the Schlossbachklamm gorge, which is spanned by the imposing and ... [more]
Rehabilitation of Sengbach Dam, Solingen
The Solingen municipal utility invited tenders for the refurbishment of the wall air side of the Sengbach Dam. This required a scaffold structure t ... [more]
Rehabilitation of the Balduin Bridge, Koblenz
The Balduin Bridge, dating from 1429, is the oldest bridge in the city of Koblenz. After a checkered history with numerous structural changes, a b ... [more]
Gschnitztal Bridge renovation on the Brenner Motorway
The Brenner Highway A13 in Tyrol forms the Austrian part of the Brenner Motorway. Built in the 1960s, it was one of the first mountain highways in ... [more]