• de
  • en
  • fr
  • International Database and Gallery of Structures

Viaduc de La Rivoire

General Information

Beginning of works: July 1995
Completion: November 1996
Duration of works: 16 months
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autoroute A51
Part of:
Coordinates: 45° 2' 55.51" N    5° 41' 3.43" E

Technical Information

Dimensions

horizontal radius of curvature 1000 m
longitudinal slope 4.8 %
deck width 2 x 10.15 m
girder depth 3.00 - 6.6 m
roadway / carriageway width 2 x 8.75 m
width of box 5.86 m
Eastern bridge total length 247.00 m
span lengths 64.00 m - 113.00 m - 70.00 m
pier P2 height 34 m
pier P3 height 41 m
Western bridge total length 241.05 m
span lengths 62.45 m - 110.70 m - 68.30 m

Quantities

deck concrete volume 4 000 m³
prestressing steel 210 t (53 kg/m³)
reinforcing steel 580 t (185 kg/m³)
formwork 18 500 m²
foundations P2 concrete volume 1 200 m³
foundations P3 concrete volume 1 200 m³
piers concrete volume 3 200 m³
reinforcing steel 413 t
formwork 9 200 m²

Materials

deck prestressed concrete
piers reinforced concrete

Chronology

July 1995

Construction begins.

Participants

Owner
Client
Design
Construction engineers
Checking engineering
Main contractor
Co-contractor
Subcontractor
Prestressing
Concrete supplier
Sheet piling

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008202
  • Date created
    13/02/2003
  • Last Update
    01/06/2017