• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Viaduc de la ravine des Trois-Bassins

General Information

Official designation: OAE 3
Beginning of works: 2005
Completion: 2009
Duration of works: 33 months
Status: in use

Project Type

Structure: Extradosed bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: ,
Part of:
Coordinates: 21° 6' 19.09" S    55° 16' 17.98" E

Technical Information

Dimensions

total length 374 m
span lengths 18.6 m - 126 m - 104.4 m - 75.6 m - 43.2 m
deck deck depth 4 - 7 m
number of lanes 2 × 2
total width 22 m
longitudinal slope 3 %
pier 1 pier height 48 m
pier 2 pier height 37 m
pier 3 pier height 8 m

Cost

construction cost (without tax) ca. Euro 30 000 000

Materials

girder prestressed concrete

Products, Services & Reports

Because the DYNA Grip ® Anchorage is without bond, load monitoring at any time is easy and individual strands in any cable can be replaced when and ...

[more]

mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structur ...

[more]

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20012809
  • Date created
    06/08/2004
  • Last Update
    05/02/2016