General Information
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Haunched girder bridge |
Material: |
Steel-concrete hybrid bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Chongqing, China |
---|---|
Crosses: |
|
Next to: |
Shibanpo Bridge (1980)
|
Coordinates: | 29° 32' 52.82" N 106° 33' 33.79" E |
Technical Information
Dimensions
main span | 330 m | |
span lengths | 86.5 m - 4 x 138.0 m - 330.0 m - 104.5 m | |
number of spans | 7 | |
length of steel span | 108.00 m | |
superstructure | deck depth | 5 - 16 m |
deck width | 19.00 m |
Materials
deck |
prestressed concrete
steel |
---|---|
piers |
reinforced concrete
|
Notes
The bridge is a prestressed concrete single-cell box girder bridge, however the main span has steel box girder section in order to achieve the span length of 330 meters.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2009): China's Major Bridges. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 1-24.
- The New Shibanpo Bridge, Chongqing, China. In: Structural Engineering International, v. 20, n. 2 (May 2010), pp. 157-160. (2010):
- Yangtze bridge doubles span length. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005), pp. 12. (2005):
- About this
data sheet - Structure-ID
20011456 - Published on:
10/01/2004 - Last updated on:
16/02/2019