General Information
Completion: | 1980 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Location
Location: |
Chongqing, China |
---|---|
Crosses: |
|
Next to: |
Shibanpo Bridge (2006)
|
Coordinates: | 29° 32' 52.19" N 106° 33' 34.93" E |
Technical Information
Dimensions
span lengths | 86.5 m - 4 x 138.0 m - 156.0 m - 174.0 m - 104.5 m | |
number of spans | 8 |
Materials
deck |
prestressed concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Boxing clever. In: Bridge Design & Engineering, v. 12, n. 44 (3rd Quarter 2006), pp. 43. (2006):
- Yangtze bridge doubles span length. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005), pp. 12. (2005):
- About this
data sheet - Structure-ID
20019977 - Published on:
12/03/2006 - Last updated on:
16/02/2019