• de
  • en
  • fr
  • International Database and Gallery of Structures

Rewa River Bridge

General Information

Beginning of works: October 2003
Completion: August 2006
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: ,
Replaces: Rewa River Bridge (1937)
Coordinates: 18° 2' 0.54" S    178° 31' 49.61" E

Technical Information

Dimensions

width 13.17 m
total length 425 m
span lengths 39.25 m - 7 x 49.5 m - 39.25 m
deck deck depth 3.3 m

Materials

deck prestressed concrete

Chronology

August 2006

Opened to traffic in an official ceremony by the President of Fiji.

Participants

Design consultants
Structural engineering
Geotechnical engineering
Contractor
Prestressing

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20019944
  • Date created
    11/03/2006
  • Last Update
    07/11/2016