General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Construction method: |
Incremental launching |
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nausori, Fiji |
---|---|
Replaces: |
Rewa River Bridge (1937)
|
Coordinates: | 18° 2' 0.54" S 178° 31' 49.61" E |
Technical Information
Dimensions
width | 13.17 m | |
total length | 425 m | |
span lengths | 39.25 m - 7 x 49.5 m - 39.25 m | |
number of spans | 9 | |
deck | deck depth | 3.3 m |
Materials
deck |
prestressed concrete
|
---|
Chronology
August 2006 | Opened to traffic in an official ceremony by the President of Fiji. |
---|
Participants
Design consultants
Structural engineering
Geotechnical engineering
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The construction of the New Rewa River Bridge, Nausori, Fiji. In: The Structural Engineer, v. 85, n. 10 ( 2007), pp. 24-31. (2007):
- About this
data sheet - Structure-ID
20019944 - Published on:
11/03/2006 - Last updated on:
07/11/2016