Pyung-Yeo 2 Bridge

General Information

Other name(s): Pyung-Yeo 2 Gyo
Beginning of works: 2002
Status: under construction

Project Type

Location

Location: , ,

Technical Information

Dimensions

main span 120 m
width 23.50 m
total length 250 m
span lengths 65 m - 120 m - 65 m

Materials

deck prestressed concrete
piers reinforced concrete

Chronology

2000
- 2002

Design phase.

Notes

Pyung-Yeo 2 Gyo is the first Extradosed Bridge in Korea. The construction period is expected to be about 39 months and construction began September, 2002. It is a turn-key project for which SK Engineering & Construction won the first prize.

Advertisement

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Masterton, Iain (2006): Slender solution. In: Bridge Design & Engineering, v. 12, n. 43 (2nd Quarter 2006), pp. 28.
  • About this
    data sheet
  • Structure-ID
    20007327
  • Date created
    29/12/2002
  • Last Update
    05/02/2016