Beginning of works: September 2002
Completion: 2005
Status: in use

Project Type

Location

Location: , ,
Coordinates: 34° 48' 20.32" N    127° 40' 54.64" E
Show coordinates on a map

Technical Information

Dimensions

main span 120 m
width 23.50 m
total length 250 m
span lengths 65 m - 120 m - 65 m
number of spans 3
stay anchor spacing 4.00 m
deck deck depth 2.70 - 3.50 m
pylons height 59.30 m
pylon height (above deck) 10.50 m

Materials

deck prestressed concrete
piers reinforced concrete

Chronology

2000 — 2002

Design phase.

Notes

Pyung-Yeo 2 Gyo is the first Extradosed Bridge in Korea. The construction period is expected to be about 39 months and construction began September, 2002. It is a turn-key project for which SK Engineering & Construction won the first prize.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Masterton, Iain (2006): Slender solution. In: Bridge Design & Engineering, v. 12, n. 43 (2nd Quarter 2006), pp. 28.
  • About this
    data sheet
  • Structure-ID
    20007327
  • Published on:
    29/12/2002
  • Last updated on:
    17/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine