General Information
Project Type
Structure: |
Three-span extradosed bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Yeosu, South Jeolla, South Korea |
---|---|
Coordinates: | 34° 48' 20.32" N 127° 40' 54.64" E |
Technical Information
Dimensions
main span | 120 m | |
width | 23.50 m | |
total length | 250 m | |
span lengths | 65 m - 120 m - 65 m | |
number of spans | 3 | |
stay anchor spacing | 4.00 m | |
deck | deck depth | 2.70 - 3.50 m |
pylons | height | 59.30 m |
pylon height (above deck) | 10.50 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Chronology
2000 — 2002 | Design phase. |
---|
Notes
Pyung-Yeo 2 Gyo is the first Extradosed Bridge in Korea. The construction period is expected to be about 39 months and construction began September, 2002. It is a turn-key project for which SK Engineering & Construction won the first prize.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Slender solution. In: Bridge Design & Engineering, v. 12, n. 43 (2nd Quarter 2006), pp. 28. (2006):
- About this
data sheet - Structure-ID
20007327 - Published on:
29/12/2002 - Last updated on:
17/02/2023