0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1992
Completion: 1997
Status: in use

Project Type

Location

Location: , ,
Address: S114
Coordinates: 52° 22' 23" N    4° 57' 29" E
Coordinates: 52° 22' 21" N    4° 56' 11" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 965 m
immersed tube unit width 31.60 m
length 158 m

Materials

tunnel structure reinforced concrete

Chronology

25 April 1997

Opened to traffic

May 2005

The IJtram (Line 26) begins service through the tunnel.

Participants

Owner
Consulting engineers
Contractor
Co-contractor
Specialist consultants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003204
  • Published on:
    09/03/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine