General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel Railroad (railway) tunnel |
Structure: |
Immersed tube tunnel |
Location
Location: |
Amsterdam, North Holland, Netherlands |
---|---|
Address: | S114 |
Coordinates: | 52° 22' 23" N 4° 57' 29" E |
Coordinates: | 52° 22' 21" N 4° 56' 11" E |
Technical Information
Dimensions
total length | 1 965 m | |
immersed tube unit | width | 31.60 m |
length | 158 m |
Materials
tunnel structure |
reinforced concrete
|
---|
Chronology
25 April 1997 | Opened to traffic |
---|---|
May 2005 | The IJtram (Line 26) begins service through the tunnel. |
Participants
Owner
Consulting engineers
Contractor
Co-contractor
Specialist consultants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Constructing the Piet Heintunnel and the Wijkertunnel. Presented at: Immersed Tunnel Techniques 2, Cork, Ireland, 23-24 April 1997, pp. 310-319. (1997):
- About this
data sheet - Structure-ID
20003204 - Published on:
09/03/2002 - Last updated on:
28/05/2021