Advertisement

Share

Follow

Donate

Mülimatt Footbridge

General Information

Name in local language: Aaresteg Mülimatt
Beginning of works: 2009
Completion: 2010
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Aare River
Coordinates: 47° 29' 6.44" N    8° 12' 55.79" E
Show coordinates on a map

Technical Information

Dimensions

width 2.70 m
sag 1.2 m
total length 183 m
sag:span 1/65
span lengths 35 m - 78 m - 35 m - 35 m

Cost

construction cost (without tax) Swiss Franc 2 470 000
cost of construction per m² Swiss Franc 5 000

Materials

deck prestressed concrete
piers steel
abutments reinforced concrete

Advertisement

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20062065
  • Date created
    10/10/2011
  • Last Update
    11/02/2018