General Information
Project Type
Structure: |
Stressed ribbon bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Brugg, Argovia, Switzerland Windisch, Argovia, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 47° 29' 6.44" N 8° 12' 55.79" E |
Technical Information
Dimensions
width | 2.70 m | |
sag | 1.2 m | |
total length | 183 m | |
sag:span | 1/65 | |
span lengths | 35 m - 78 m - 35 m - 35 m | |
number of spans | 4 |
Cost
construction cost (without tax) | Swiss Franc 2 470 000 | |
cost of construction per m² | Swiss Franc 5 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
steel
|
abutments |
reinforced concrete
|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A comparison of three different systems of stress ribbon bridges. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
20062065 - Published on:
10/10/2011 - Last updated on:
20/01/2024