0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Marieholmstunneln
Beginning of works: 23 May 2013
Completion: 2020
Status: under construction

Project Type

Structure: Immersed tube tunnel
Function / usage: Road tunnel
Construction method: Immersed tube method

Location

Location: , ,
Coordinates: 57° 43' 43.26" N    11° 59' 22.49" E
Coordinates: 57° 43' 32.66" N    11° 59' 45.51" E
Show coordinates on a map

Technical Information

Dimensions

length 500 m
number of lanes 2 x 3
number of tubes 2

Case Studies and Applied Products

Marieholmstunneln connects the banks of the Göta älv river

Marieholmstunneln connects the banks of the Göta älv river

One of the most interesting tunnels in Scandinavia, the Marieholmstunneln, is currently being realized in the city of Gothenburg. In future, the 306 m long connection will ensure that the river Göta älv can be quickly crossed using the a ... [more]

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20074095
  • Published on:
    27/10/2017
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine