General Information
Name in local language: | Puente Ingeniero Carlos Fernández Casado |
---|---|
Other name(s): | Barrios de Luna Bridge |
Beginning of works: | 1981 |
Completion: | 1983 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Three-span cable-stayed bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Pobladura de Luna, Sena de Luna, León, Castile-Leon, Spain Los Barrios de Luna, León, Castile-Leon, Spain |
---|---|
Address: | AP-66 |
Crosses: |
|
Coordinates: | 42° 53' 46.14" N 5° 53' 17.51" W |
Technical Information
Dimensions
main span | 440.00 m | |
span lengths | 101.71 m - 404.00 m - 101.71 m | |
number of cables | 220 | |
number of spans | 3 | |
deck | deck depth | 2.30 m |
deck width | 22.50 m | |
number of lanes | 2 x 2 | |
pylon 1 | height | 102.3 m |
pylon 2 | height | 117.3 m |
Materials
cables |
steel
|
---|---|
deck |
prestressed concrete
|
pylons |
reinforced concrete
|
anchorages |
reinforced concrete
|
Case Studies and Applied Products
Expanded applications with ATIS Cableskin® - the long-term corrosion protection system for cables
ATIS Cableskin® is a corrosion protection system where butyl rubber tapes are applied to the cable surface in two layers. Due to the cold-welding properties of the material, a robust coating of the cable tha ... [more]
Ingeniero Fernández Casado Stay Cable Bridge
The Ingeniero Fernández Casado Bridge near León in northern Spain was opened in 1983. At the time, it was the stay cable bridge with the world’s largest span. A total of 220 stay cables are attached at the two 102.3 and 117.3 m high, H-s ... [more]
Excerpt from Wikipedia
The Ingeniero Carlos Fernández CasadoBridge (also called: Engineer Carlos Fernández Casado Bridge) is a cable-stayed bridge that crosses the Barrios de Luna Reservoir in the province of León, Spain. It is part of the Autovia A-66, a major highway. It was inaugurated in 1983 and was the longest cable-stayed bridge by main span from 1983 to 1986.
The bridge was designed by Javier Manterola, in honor of the work that the Spanish bridge architect Carlos Fernández Casado (1905–1988) had contributed to society.
Design
The bridge has two piers that divide it into three parts. Each pier is 100 meters tall and has two 27-meter long front cables and two 28-meter long rear cables, for a total height of 220 meters. The two laterals are 66-meters long, and the central part of the bridge is 440-meters long. The total length of the bridge is 643 meters.
The bridge had the largest main span of any bridge in Spain until the inauguration of the La Constitución de 1812 Bridge on September 24, 2015 in the bay of Cádiz.
Text imported from Wikipedia article "Engineer Carlos Fernández Casado Bridge" and modified on July 22, 2019 according to the CC-BY-SA 4.0 International license.
Participants
-
Carlos Fernández Casado S.L.
- Javier Manterola (designer)
Relevant Web Sites
Relevant Publications
- Autopista Campomanes-León. Los puentes. In: Hormigón y acero, v. 35, n. 151 (2nd Quarter 1984), pp. 9-130. (1984):
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 207. (1990):
- Inyección de cables postesados de gran longitud y fuerte inclinación. In: Hormigón y acero, v. 36, n. 157 (4th Quarter 1985), pp. 219-227. (1985):
- Un modelo global de tráfico para la evaluación y gestión de puentes construidos: Aplicación y ejemplos. In: Hormigón y acero, v. 49, n. 209 (3rd Quarter 1998), pp. 109-125. (1998):
- Le Passage. 1st edition, Everest Communication, Luxembourg (Luxembourg), pp. 68-69. (1999):
- About this
data sheet - Structure-ID
20000648 - Published on:
01/04/2000 - Last updated on:
30/05/2017