• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Bannosu Viaduct

General Information

Beginning of works: 1978
Completion: 1988
Status: in use

Project Type

Structure: main bridge:
Deck truss bridge
Continuous truss bridge
Function / usage: Motorway bridge / freeway bridge
Railroad (railway) bridge
Material: main bridge:
Steel bridge

Location

Location: , ,
Part of:
Coordinates: 34° 21' 17.28" N    133° 49' 42.04" E

Technical Information

Dimensions

main bridge
total length 480
span lengths 150 m - 180 m 150 m
horizontal radius of curvature 1 300 m
pier PVa1P height 46.5 m
truss height max. 28 m

Materials

piers reinforced concrete
deck truss steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072079
  • Date created
    05/11/2016
  • Last Update
    25/11/2016