Dimensions
main span | 234 m | |
rise | 42.50 m | |
total length | 400 m | |
arch span | 220 m | |
deck | deck width | 2 x 13.50 m |
Completion: | July 2006 |
---|---|
Status: | in use |
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Steel bridge |
Construction method: |
deck: Incremental launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
arches: Rotation around a horizontal axis |
Location: |
Hinojal, Cáceres, Extremadura, Spain Cañaveral, Cáceres, Extremadura, Spain |
---|---|
Crosses: |
|
Coordinates: | 39° 43' 10.43" N 6° 24' 38.34" W |
main span | 234 m | |
rise | 42.50 m | |
total length | 400 m | |
arch span | 220 m | |
deck | deck width | 2 x 13.50 m |
July 2006 | Completion. |
---|
The two arches were constructed by lifting the two semi-arches into a vertical position and subsequently swivel lowering them for their crown closure.