General Information
Status: | in use |
---|
Project Type
Structure: |
Through arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Concrete-filled steel tube (CFST) bridge |
Location
Location: |
Anhui, China |
---|---|
Next to: |
Huangshan Taiping Lake Bridge (1996)
|
Coordinates: | 30° 19' 49.29" N 117° 57' 3.90" E |
Technical Information
Dimensions
main span | 336 m |
Materials
arches |
concrete-filled steel tubes
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2010): Design and Optimization of A Long Span Concrete Filled Steel Tubular Arch Bridge. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 854-855.
- About this
data sheet - Structure-ID
20058458 - Published on:
03/10/2010 - Last updated on:
05/02/2016