0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Design and Optimization of A Long Span Concrete Filled Steel Tubular Arch Bridge

 Design and Optimization of A Long Span Concrete Filled Steel Tubular Arch Bridge
Author(s): , ,
Presented at IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, published in , pp. 854-855
DOI: 10.2749/222137810796064084
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.13 MB

The Taiping Lake Bridge is a concrete filled steel tubular (CFST) arch bridge located in Anhui, China. In order to ensure the safety and durability performance of this bridge for construction and o...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Published in:
Page(s): 854-855 Total no. of pages: 6
Page(s): 854-855
Total no. of pages: 6
Year: 2010
DOI: 10.2749/222137810796064084
Abstract:

The Taiping Lake Bridge is a concrete filled steel tubular (CFST) arch bridge located in Anhui, China. In order to ensure the safety and durability performance of this bridge for construction and operation stages, finite element method is used to optimize the detailed design of arch spring, as well as the construction plan. Ultimate Load Carrying Capacity (ULCC) is also analyzed to obtain the real collapse process of this bridge. The results show that the weak sections of Taiping Lake Bridge are always at the vault and the 1/8 sections during the symmetric loading processes. The ultimate load carrying capacity is determined by these key sections.

Keywords:
finite element method (FEM) ultimate load carrying capacity CFST arch bridge construction plan optimization

Structures and Projects