General Information
Completion: | 1838 |
---|
Project Type
Function / usage: |
Railroad (railway) line |
---|
Location
km | Name |
Technical Information
Dimensions
length | 180 km | |
track gauge | 1 435 mm |
Participants
Relevant Web Sites
Relevant Publications
- An Account of the Performances of the Locomotive Engines on the London and Birmingham Railway During the Year 1839. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 1, n. 1840 ( 1841), pp. 33-34. (1841):
- An Account of the Repairs Done to the Beechwood Tunnel, upon the London and Birmingham Railway, September 1840. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 1, n. 1841 ( 1841), pp. 142-143. (1841):
- Description of the Method Employed for Draining some Banks of Cuttings on the London and Croydon, and London and Birmingham Railways; and a Part of the Retaining Wall of the Euston Incline, London and Birmingham Railway. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 4, n. 1845 ( 1845), pp. 78-82. (1845):
- On the Locomotive Engines of the London and Birmingham Railway. In: Transactions of the Institution of Civil Engineers, v. 3, n. 4 (January 1841), pp. 305-342, plate. (1841):
- Robert Stephenson and planning the construction of the London and Birmingham Railway. Presented at: First International Congress on Construction History, Madrid, 20-24.01.2003. (2003):
- About this
data sheet - Structure-ID
10000875 - Published on:
04/03/2006 - Last updated on:
29/03/2023