0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1981
Status: in use

Project Type

Function / usage: Airport

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

site area 1 300 ha

Chronology

1 July 1981

The airport / Terminal 1 begins operating.

29 December 1981

Official opening of Terminal 1.

22 November 1990

Terminal 2 goes into operation.

1 June 1991

Official opening of Terminal 2.

2002 — 2008

Construction of an Automated People Mover to connect the three terminals.

2008

Scheduled opening of Terminal 3.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    10000612
  • Published on:
    01/12/2004
  • Last updated on:
    28/06/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine