General Information
Project Type
Function / usage: |
Airport terminal building |
---|---|
Structure: |
Truss |
Location
Location: |
Singapore |
---|---|
Part of: | |
Coordinates: | 1° 21' 22.27" N 103° 59' 11.13" E |
Technical Information
Dimensions
roof truss | length | 215 m |
Quantities
structural steel | 14 000 t | |
concrete volume | 173 000 m³ | |
reinforcing steel | 91 000 t |
Cost
cost of construction | Singapore dollar 1 500 000 000 |
Materials
roof truss |
steel
|
---|---|
columns |
reinforced concrete
|
floor slabs |
reinforced concrete
|
floor beams |
reinforced concrete
|
Notes
The main roof consists of 20 nos. of main trusses (length 215m) and supported by 5 nos. of RC column at uneven intervals. The 215m trusses were asembled on the 2nd storey in pairs and lifted up to the top of the columns by strand jacks.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Changi Airport Terminal 3, Singapore. In: Structural Engineering International, v. 19, n. 1 (February 2009), pp. 28-32. (2009):
- About this
data sheet - Structure-ID
20014648 - Published on:
01/12/2004 - Last updated on:
29/04/2021