0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1997
Completion: 2002
Status: in use

Project Type

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

length 9.4 km
length of viaducts 1 025 m
number of stations 15
length of bored tunnels 3.765 km
length of cut-and-cover tunnels 3.735 km

Design Loads

design speed 80 km/h

Cost

cost of construction Euro 460 000 000

Chronology

6 January 1997

Beginning of construction.

12 January 1998

Beginning of tunnel boring.

15 March 2000

End of tunnel boring.

25 July 2000

First train tests.

Participants

Co-contractor

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    10000097
  • Published on:
    09/06/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine