General Information
Project Type
Function / usage: |
Metro (Subway, Underground) Line |
---|
Location
km | Name |
Technical Information
Dimensions
length | 9.4 km | |
length of viaducts | 1 025 m | |
number of stations | 15 | |
length of bored tunnels | 3.765 km | |
length of cut-and-cover tunnels | 3.735 km |
Design Loads
design speed | 80 km/h |
Cost
cost of construction | Euro 460 000 000 |
Chronology
6 January 1997 | Beginning of construction. |
---|---|
12 January 1998 | Beginning of tunnel boring. |
15 March 2000 | End of tunnel boring. |
25 July 2000 | First train tests. |
Relevant Web Sites
Relevant Publications
- Métro de Rennes. In: Tunnels et Ouvrages Souterrains, n. 170 (March - April 2002), pp. 69-72. (2002):
- Le métro Val de Rennes. In: Bulletin annuel de l'AFGC, n. 3 (January 2001), pp. 11-13.
- Le VAL à Rennes. Nature et Bretagne. (1995):
- Val de Rennes. In: VSL News, v. 9, n. 1 ( 1998), pp. 6. (1998):
- Le VAL de Rennes. Un combat pour la ville. Apogée, pp. 167. (2002):
- About this
data sheet - Structure-ID
10000097 - Published on:
09/06/2002 - Last updated on:
28/05/2021