0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1997
Completion: 2002
Status: in use

Project Type

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

length 9.4 km
length of viaducts 1 025 m
number of stations 15
length of bored tunnels 3.765 km
length of cut-and-cover tunnels 3.735 km

Design Loads

design speed 80 km/h

Cost

cost of construction Euro 460 000 000

Chronology

6. January 1997

Beginning of construction.

12. January 1998

Beginning of tunnel boring.

15. March 2000

End of tunnel boring.

25. July 2000

First train tests.

Participants

Co-contractor

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    10000097
  • Published on:
    09/06/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine