Informations générales
Type de construction
Structure: |
Gravity dam |
---|---|
Fonction / utilisation: |
Fresh water dam |
Matériau: |
Concrete dam |
Situation de l'ouvrage
Lieu: |
Santa Clarita, Los Angeles County, California, USA |
---|---|
Impounds: |
|
Coordonnées: | 34° 32' 49.97" N 118° 30' 46.24" W |
Informations techniques
Dimensions
height | 63.44 m |
Matériaux
dam structure |
concrete
|
---|
Chronologie
12 March 1928 | Excessive leakage causes William Mulholland to inspect the dam who reports it to be perfectly safe. |
---|---|
13 March 1928 | The dam gives way and the flood kills roughly 400 people. |
Remarques
The dam failure was blamed on unstable rock foundations.
Intervenants
Design
- William Mulholland (designer)
Sites Internet pertinents
Publications pertinentes
- From Fame to Failure: The St. Francis Dam (Part 1). Dans: Civil Engineering Magazine, v. 89, n. 7 (juillet 2019), pp. 40-43. (2019):
- From Fame to Failure: The St. Francis Dam (Part 2). Dans: Civil Engineering Magazine, v. 89, n. 8 (septembre 2019), pp. 42-45. (2019):
- Man-Made Disaster, The Story of St. Francis Dam. Dans: Environmental and Engineering Geoscience, v. 15, n. 4 (septembre 1978), pp. 387-388. (1978):
- Report of the commission appointed to investigate the failure of the St. Francis dam. Dans: Journal of The Franklin Institute, v. 206, n. 2 (août 1928), pp. 254-255.
- Simulation of the St. Francis Dam-Break Flood. Dans: Journal of Engineering Mechanics (ASCE), v. 133, n. 11 (novembre 2007), pp. 1200-1212. (2007):
- Informations
sur cette fiche - Structure-ID
20001408 - Publié(e) le:
31.03.2001 - Modifié(e) le:
22.10.2023