Paolo Romualdi
- Structural behaviour of precast tunnel segments in fiber reinforced concrete. Dans: Tunnelling and Underground Space Technology, v. 26, n. 2 (mars 2011). (2011):
- Headrace tunnel of the El Alto hydropower project in Panama / Druckstollen des Wasserkraftprojekts El Alto in Panama. Dans: Geomechanics and Tunnelling, v. 6, n. 4 ( 2013). (2013):
- Dez-Ghomrud Water Convey Tunnel Project. Dans: Felsbau, v. 22, n. 6 ( 2004). (2004):
- Analysis of TBM-Rock-Lining Interaction in Squeezing Ground. Dans: Felsbau-Magazin, n. 6 ( 2007). (2007):
- La galleria di Abdalajais a Malaga. Dans: Strade e Autostrade, v. 10, n. 55 (janvier 2006). (2006):